RallyPropRallyProp.ai
OSW27BZ01-DV002ActiveSBIR

Counter-Unmanned Aerial Systems Rapid Maturation

Department of DefenseOSD

AI Overview

This RFP seeks mature counter-UAS technologies to detect, identify, and defeat low-altitude unmanned aircraft threatening tactical forces and infrastructure. Solutions should operate independently in denied environments without requiring permanent infrastructure, cloud connectivity, or target RF emissions.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
October 7, 2026
Due Date
November 25, 2026

Official Description

Inexpensive, highly maneuverable, commercially available unmanned aerial systems (UAS) threaten tactical forces, critical infrastructure, and installations. Current defenses are limited by cost, by the operator attention they require, and by their vulnerability to countermeasures. A capability gap against Group 1 and Group 2 UAS remains.

This topic seeks mature or maturing technology at any point in the counter-UAS kill chain. The three areas below are where capability is most needed. They are ...

View on official source

Change History

Q&A UpdatedNov 12, 2026 at 9:03 PM

Material change · Requirements + Description + Submission

Counter-Unmanned Aerial Systems Rapid Maturation

  • Q5 and Q6 (new/merged): Q5 was added, and Q6 repeats the same question about the corrected rubric. Both now give the corrected Direct to Phase II weights (Version 2 of the component instructions, posted November 5): Introduction 5%, Mission Relevance 24%, Demand Signal 30%, Validated Technical Maturity 12%, Trade Study Example 6%, Prototype Delivery Plan 12%, Commercial Viability 6%, Submission Quality 5%, totaling 100%.
  • Q7 (previously Q5): Answer changed from "posture is captured, not scored as partial or full" to "Operating Preference Posture is scored under Mission Relevance." Proposals meeting few preferences score lower than those meeting most or all, and leaving any preference unaddressed scores Unsatisfactory. This is a material change to how applicants will be evaluated.
  • Q10 onward: Questions renumbered after the new Q5/Q6; content is otherwise unchanged.
  • Q15 (previously Q13), Q14, Q16: Carried forward without substantive change.

Why it matters: the rubric weights are now published and sum to 100%, and the operating-preference scoring rule is now explicit, so applicants should weight Mission Relevance and Demand Signal heavily and address all four preferences.

Q&A UpdatedNov 12, 2026 at 2:03 PM

Material change · Requirements + Submission + Eligibility + Description

Counter-Unmanned Aerial Systems Rapid Maturation

  • Q1 (proprietary marking): New question. Proprietary marking legend may sit on the first Basic Information page, outside the page limit.
  • Preference (b) and radiation: New Q2–Q3. Preference (b) covers intentional emissions only; for passive sensing on transmit-capable hardware, it is assessed on the fielded configuration, and the proposal must state how transmit is disabled.
  • Direct to Phase II IP ownership: New Q4. A list of assigned patents plus a signed ownership statement is sufficient and counts toward the five-page Volume 5 limit.
  • Four operating preferences: New Q5. Proposals not addressing all four have Technical Merit capped; partial posture is considered at selection, not scored partially.
  • Post-test analysis and TRL 6 environment: New Q6–Q7. Post-test data analysis counts as a documented test; emulated subsystems or surrogates are allowed in a representative environment if identified and justified.
  • Untested elements: New Q8. Untested elements are weighed as risk, and the proposal must describe how Phase II retires that risk.
  • Renumbering: The earlier Q1–Q15 items (formal verification, paragraph spacing, SBIR feasibility, page limits, rubric weights) are carried forward unchanged in substance, now numbered Q9–Q16.

Why it matters: applicants now have explicit rules on page-limit placement of the proprietary legend, how transmit-disabled sensors are judged, IP ownership evidence, and how untested or surrogate-based evidence will be weighed for TRL 6.

Q&A UpdatedNov 7, 2026 at 5:02 PM

Material change · Requirements + Description + Submission

Counter-Unmanned Aerial Systems Rapid Maturation

  • New Q&As added (Q1–Q2 and Q12 in the updated version are new or changed):

    • Q1 (new): Bare-metal RTL payloads with no OS or firmware. The Government will not prescribe a cybersecurity test method, so formal verification of state logic may be proposed. Testing at a prime contractor's facility may count as a simulated field environment. Letters of intent are not scored.
    • Q2 (new): Paragraph spacing may be added to the template, as long as font, size, margins and structure stay unchanged.
    • Q3 (new): The "Submission Question" heading stays in the volume with no text beneath it.
    • Q15 (replaced; previously Q12): The mobile-power configuration question was rephrased and now asks whether a test with a representative C-UAS payload satisfies the Phase I-equivalent feasibility requirement without a UAS engagement. The earlier answer (out of scope) was dropped from the thread.
  • Previously removed or renumbered: The earlier Q12 (mobile power subsystem, answered "No, out of scope") and Q13 (mechanically moving parts) no longer appear in the same form. Earlier Q14 (portable configuration tested before submission) and Q15 (end-to-end concept eligibility) are also absent from the updated list.

  • Why it matters: Applicants building a cybersecurity or software-free payload now have a stated path, and the contractor-facility test option may affect how TRL 6 evidence is planned. Formatting answers clarify that spacing and a blank heading are acceptable. The mobile-power scope question needs its new answer to be checked before relying on it.

Q&A UpdatedNov 5, 2026 at 1:02 PM

Material change · Requirements + Description + Submission

Counter-Unmanned Aerial Systems Rapid Maturation

  • New Q&A added at the top (Q1): Clarifies that Direct to Phase II feasibility cannot rest on a prior or ongoing SBIR/STTR award. An SBIR-funded element may be described, but the feasibility evidence must come from non-SBIR work (Volume 5).
  • Renumbering: All prior questions shifted down by one (for example, the page-limit question is now Q2 and the eligibility-of-end-to-end-concept question is now Q15). The content of the existing answers is unchanged.
  • Removed: The earlier duplicate Q4 about the five-page limit was dropped as a repeat of the page-limit question; the answer is the same.

Why it matters: The new Q1 is the key change for D2P2 applicants who combine elements from prior SBIR work into one concept. Your feasibility package must independently show Phase I-equivalent results, not lean on the SBIR-funded piece.

Q&A UpdatedNov 4, 2026 at 2:50 PM

Material change · Requirements + Submission + Description

Counter-Unmanned Aerial Systems Rapid Maturation

  • Added 12 new Q&As (Q5–Q14 in the updated version was previously Q5–Q14; the prior version had only Q1–Q2). New topics include:
    • Page limit (Q1, Q4): The Basic Information table does not count toward the five-page limit; instruction pages and instruction text must be deleted. The five pages are for the seven parts.
    • Phase II rubric (Q3): The Direct to Phase II weights published totaled only 89%; the table is being corrected to total 100%.
    • Scope (Q5, Q11): Post-engagement exploitation of recovered UAS data is in scope as a gap topic. Mobile power subsystems without UAS engagement are out of scope.
    • Feasibility evidence (Q2, Q5, Q13, Q14): Surrogate targets need not be unmanned aircraft; foreign partner evaluation data is acceptable if it meets documentation and export-control rules; portable adaptation may occur in Phase II; separately documented element tests are acceptable for end-to-end concepts.
    • Submission and program (Q9, Q10, Q6–Q8): A firm may submit one proposal to each topic (Phase I and D2P2); the number of awards will not be disclosed; no specific systems or data access are guaranteed; the offeror must identify its own transition partner; acquisition interest is DRPM UxS and OASW(SO/LIC).
    • Mechanically moving parts (Q12): Permitted, no restriction.

Why it matters: applicants with a five-page technical volume should delete instruction text now, and Direct to Phase II applicants can rely on separately documented element tests and post-engagement scope.

Q&A UpdatedNov 3, 2026 at 9:01 PM

Material change · Requirements + Description

Counter-Unmanned Aerial Systems Rapid Maturation

  • New Q&A added: Q1 asks whether a documented onboard identification test flown from a small UAS against ground vehicle targets, with non-target vehicles present, can satisfy the requirement to test against a target or surrogate for Direct to Phase II feasibility documentation. The answer says the target or surrogate does not have to be an unmanned aircraft. Feasibility documentation must state the conditions, dates, target or surrogate, measured result, and measurement method, and evaluators will judge how well the surrogate represents the threat.
  • Why it matters: Applicants planning Direct to Phase II feasibility evidence can use ground vehicle targets or other surrogates, not just unmanned aircraft, provided the documentation is complete and the surrogate credibly represents the threat.
  • Repeated Q&A: The mechanically moving parts question (now Q2) was reformatted but its answer is unchanged: moving parts are permitted with no restriction.
Q&A UpdatedNov 3, 2026 at 8:01 PM

Informational change · Requirements + Description

Counter-Unmanned Aerial Systems Rapid Maturation

  • New Q&A added: Q1 asks whether the unit can have mechanically moving parts. The answer states the topic places no restriction on mechanically moving parts.

Why it matters: Applicants designing hardware with moving components (for example actuators, pumps, or mechanical assemblies) can treat this as a confirmed open design option rather than a disqualifier, though they should still check the rest of the solicitation for other hardware constraints.

Status ChangedOct 28, 2026 at 1:03 PM

Informational change · Status

Counter-Unmanned Aerial Systems Rapid Maturation

The solicitation's status moved from Pre-Release to Open. Applicants can now submit proposals under the full solicitation, so pre-release preparation should shift to finalizing and submitting a complete application before the stated deadline. Check the posted close date and any required registrations (such as SAM.gov and agency portal accounts) now, since those can take time to clear. Review the full solicitation text as released, because requirements that were previewed or tentative during pre-release may now be binding.

Opportunity AddedOct 7, 2026 at 12:02 PM

Counter-Unmanned Aerial Systems Rapid Maturation

New opportunity: Counter-Unmanned Aerial Systems Rapid Maturation

Similar Opportunities

Get Alerts for Opportunities Like This

RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.

Build Your Free Lane