AI Overview
ERDC seeks engineering designs for an emergency closure system to rapidly halt uncontrolled water flow at Winfield Locks and Dam during primary gate failure. The unique challenge: deploying a deployable barrier via barge-mounted crane under active flow conditions while respecting existing infrastructure constraints and load limits.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
The U.S. Army Engineer Research and Development Center (ERDC) invites solutions to support the engineering prototype concept design of an emergency closure system for Winfield Locks and Dam in Winfield, West Virginia. This effort aims to develop a deployable closure system capable of halting uncontrolled flow during a primary roller gate failure while operating within existing site constraints and load handling capabilities.
Change History
Material change · Funding + Attachment
Emergency Closure System for Winfield Locks and Dam
No substantive funding change was made. The only edit to the funding profile replaces "one or more other transaction(s)" with "one Other Transaction," which narrows the wording to a single award but leaves the $2,100,000 ceiling, the full-funding statement, the FY27 to FY28 performance period, and the follow-on production authority unchanged. Because the ceiling and cost share are the same, proposal size is unaffected, though applicants should note the government now signals a single award rather than possibly multiple awards.
Material change · Scope + Requirements + Description
Emergency Closure System for Winfield Locks and Dam
- Stage shifted from design to prototype: The overview and description now call for "engineering prototype concept design" instead of "engineering design," signaling that applicants should propose a concept-level prototype rather than a full engineering design.
- New 12-hour deployment limit: The deployment requirement now mandates that the closure system be implemented in under 12 hours, adding a time-to-deploy performance constraint that the earlier version did not state.
- Relaxed dimensional envelope: The system may now extend either upstream or downstream of the bulkhead recess, provided it does not interfere with the roller gate. This gives designers more geometric freedom than the previous strict confinement to the recess.
Why it matters: Applicants must now design for a sub-12-hour deployment window and can propose a configuration that extends beyond the recess, which may open alternative concepts. The shift to "concept design" lowers the expected maturity of submissions, so proposals should emphasize feasibility and prototype pathway rather than final engineered detail. Hydrodynamic, lifting beam, EM 1110-2-2107, span, and 27 ft design head requirements are unchanged.
Critical change · Deadline
Emergency Closure System for Winfield Locks and Dam
The close date moved from October 23, 2026 to November 6, 2026, a shift of 14 days later. Applicants gain two extra weeks to prepare and submit their responses. Teams that had planned around the October deadline should confirm their timeline still works, but the change reduces time pressure and allows more room for proposal development, partner coordination, or required registrations.
Emergency Closure System for Winfield Locks and Dam
New ERDC WERX opportunity: Emergency Closure System for Winfield Locks and Dam
Similar Opportunities
Get Alerts for Opportunities Like This
RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.
Build Your Free Lane