3389 Large Class Hopper Dredge (LCHD-ESS)
AI Overview
Seeks a new 6,500 cubic yard diesel-electric hopper dredge with azimuthing thrusters to replace the aging ESSAYONS for USACE Portland District waterway maintenance. Focuses on seakeeping, maneuvering, and flexible sizing for harsh West Coast conditions.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
--- Attachment text --- [3389_LCHD_ESS_RFI_Group__3_Responses___16NOV2026__002_.pdf] 3389 RFI Package #3 39. The client prefers commercial off-the-shelf items. These products indeed offer many advantages. However, one drawback is that the available sizes increase in steps. When a fixed figure of 150% is specified, this often results in machines that are far too large. In addition, designers also build in margins that apply even under the most extreme conditions. These extreme conditions, however...
Change History
Material change · Requirements + Description + Submission
3389 Large Class Hopper Dredge (LCHD-ESS)
- Solicitation amendment swapped in new attachments: The Section C statement of work was replaced by "AMEND 004" (2 Nov 2026, now 441 pages, up from 439), and a new "RFI Group #2 Responses" document was added. The earlier Section C (SEP2026) and the prior vessel visit sheet were removed.
- Updated vessel visit logistics: A revised "ESSAYONS Vessel Visit 4NOV2026" sheet sets the pick-up at 0800 from a Rainier, OR location, requires personal protective equipment, and restricts questions to the formal RFI process (none answered aboard the vessel).
- New RFI Group #3 answers (this version): Q39 on commercial off-the-shelf sizing: the government will consider exceptions case by case, with no change to the contract.
- Hopper density clarified (Q40/Q41): The contractor may assume a maximum in-situ density of 1.95 and must still achieve a practical hopper target of 1.8 specific gravity. This governs loading-time calculations.
- Section C amended to version 006: The vessel requirements text (C001/C002) was reissued, reflecting the density and RFI clarifications.
Why it matters: Bidders must price hopper loading and cycle time using the 1.95 in-situ cap and 1.8 target, not the lower or higher densities previously implied. Offerors should re-check their sizing assumptions against the revised Section C and use the formal RFI channel for any further questions.
Material change · Attachment + Scope + Contact + Requirements + Description
3389 Large Class Hopper Dredge (LCHD-ESS)
- Site visit pickup location changed: The Essayons vessel visit (4 Nov 2026) previously offered two options, Astoria, OR (301 36th Street) or Westport, OR (Westport County Park Boat Ramp), to be confirmed on 2 Nov. The updated version sets a single location: 107 W C St, Rainier, OR 97048, with the 0800 pickup time unchanged.
- Section C statement of work amended: Amendment 004 (2 Nov 2026) adds pages to the Section C performance specification, growing from 439 to 441 pages. The amendment reflects "associated changes to Section C" tied to RFI questions, though the attachment text does not detail the specific technical edits.
- RFI Group #2 responses added: A new 4-page document of RFI responses was issued 2 Nov 2026, so offerors should review it for clarifications on the dredge requirements.
- Context: The procurement is for a Large Class Hopper Dredge (LCHD-ESS) with 6,500 cubic yard capacity, diesel-electric power, azimuthing thrusters, ABS classification, and Jones Act compliance, replacing the ESSAYONS.
Why it matters: Applicants planning to attend the site visit need the new Rainier pickup point, and anyone pricing or designing the vessel must check the amended Section C and the new RFI responses, since they may alter technical requirements.
Material change · Requirements + Submission + Attachment + Scope + Description
3389 Large Class Hopper Dredge (LCHD-ESS)
- The description swapped out the prior attachment set (RFI Group 1 responses covering page-count rules, CMMC Level 2 (Self), drawing 924-C004-01 submission rules, dredge station-keeping and current-orientation limits, Columbia River reference sediment, and hopper loading time assumptions) for new attachments.
- New content: an ESSAYONS vessel visit document (November 4, 2026 pick-up at 0800 from Astoria or Westport, OR; PPE required; questions must go through the formal RFI process, not asked on board).
- New content: a Use of Artificial Intelligence disclosure stating the Government may use AI tools (IL5 or higher) for summarizing content, checking basic compliance, and organizing proposal data, but not for evaluative judgments or selection decisions, and contractor data may not be used to train external models.
- Amendment 0004 (SF 30) states its purpose is to provide site-visit information and AI-use disclosure; offer deadline is not extended, and the signature date is October 28, 2026.
Why it matters: Applicants who relied on the RFI responses for technical requirements (dredge current limits, hopper loading basis, CMMC level, drawing submittals) should verify those points against the current package, since the description now lists different attachments. Offerors planning to attend the vessel visit need to register via the listed contacts and plan for the early-morning pick-up. Proposal teams should also note that AI tools may process their submissions for administrative support.
Critical change · Deadline
3389 Large Class Hopper Dredge (LCHD-ESS)
The open date moved from September 1, 2026 to October 7, 2026, a delay of 36 days. Applicants get the funding opportunity later than originally planned, so they have less lead time to prepare proposals before the opening, though the close date may or may not have moved as well (this change does not show a close-date change). Business-development teams should push back internal preparation timelines, and should confirm whether the submission deadline also shifted or whether the application window is now shorter.
Critical change · Deadline
3389 Large Class Hopper Dredge (LCHD-ESS)
The close date moved from March 15, 2027 to April 15, 2027, a shift of 31 days later. Applicants gain one additional month to prepare and submit their responses. Teams that were planning to submit in mid-March can now allocate more time for proposal development, budget review, and internal sign-offs, but should not deprioritize the revised deadline, since the new date is still fixed and late submissions are typically not accepted.
Informational change · Description
3389 Large Class Hopper Dredge (LCHD-ESS)
- Proposal page count: All submitted pages count, except past-performance questionnaires, CPARS records, the Preliminary Design Report, commitment and teaming letters/agreements, and catalog cut sheets. The Summary Section is not exempt.
- Cybersecurity: USACE confirmed CMMC Level 2 (Self) is required for systems handling FCI or CUI during the contract.
- Pricing format: Excel is required only for price-breakdown information supporting EPA documentation—not for every Section B price breakdown.
- Cyber Resilience classification: The Section H drawings/documents for the ABS Cyber Resilience notation must go to both the Government and ABS for review and approval. USACE will correct the duplicate drawing number, add the CR notation to Section C, and list deliverables in C004.
- Dredging performance assumptions: For material properties, use the Overall Average grain-size distribution for Columbia River Mile 03–103 in the cited soil-classification document (page 9). Loading-time analysis must account for draft changing from hopper-empty to 6,500 cubic yards of 1.8-SG material.
- Station-keeping and pipeline operation: Questions about holding position in cross-currents and orienting with the current are referred to C002 clarifications and modifications; the response excerpt does not state the exact revised operating criteria. Applicants should check revised C002 before selecting thruster arrangements.
Material change · Description + Scope + Requirements
3389 Large Class Hopper Dredge (LCHD-ESS)
Amendment 002 added detailed technical specifications and operational requirements for the Large Class Hopper Dredge replacement vessel, including capacity, propulsion system, Jones Act compliance, and mission parameters.
3389 Large Class Hopper Dredge (LCHD-ESS)
New opportunity: 3389 Large Class Hopper Dredge (LCHD-ESS)
Similar Opportunities
Pre-Solicitation Notice for Indefinite Delivery Contract (IDC) for Regional Dredge Multiple Award Task Order (MATOC) - USACE Huntington District - W91237-27-R-A003
Due December 9, 2026
ActiveJacksonville Harbor Maintenance Dredging
Due December 3, 2026
ActiveSources Sought Notice: Cape May Railroad Dredged Material Placement Facility (DMPF) Maintenance Repairs
Due December 2, 2026