This solicitation closed on November 20, 2026
View current Department of Defense opportunities →Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX
AI Overview
Design-build maintenance and repair services for an Army Reserve Equipment Concentration Site at Fort Hood, Texas, including civil, architectural, MEP, and cybersecurity design work. Solicits contractor proposals for facility construction and upkeep.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
--- Attachment text --- [Solicitation_Amendment_W912QR25RA013_0005_SF_30.pdf] 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the...
Change History
Critical change · Deadline + Attachment + Requirements + Description
Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX
- Amendment 0005 (dated 23 Nov 2026) replaces Amendment 0004 and moves the Phase II proposal due date from 02 December 2026 to 08 December 2026 at 2:00 p.m. ET.
- Specification updates: a new "W912QR25RA013_Specs-0005" document is added to the attachment list, and the Table of Contents, Part 03 (Site Civil Design), Part 06 (Architectural and Interior Design), Part 17 (South MEP Lot Design), and Appendix C (Room-by-Room Supplemental Instructions) are replaced.
- New requirements added: Part 18 (Cybersecurity Design) and a new Section 01 45 00.25 10, Construction Management Platform (CMP).
- Plan sheets: none replaced or added in this amendment.
- Why it matters: Offerors invited to Phase II get six extra days, but they must price and design to the revised specifications, including new cybersecurity and construction management platform requirements. Teams should update cyber compliance and CMP tooling in their cost estimates and confirm acknowledgment of the amendment before the deadline.
Critical change · Deadline + Requirements + Attachment + Submission + Scope + Description
Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX
- Proposal due date extended: Phase II proposals are now due 02 December 2026 at 2:00 p.m. ET, moved from 20 November 2026 at 2:00 p.m. ET. Offerors invited to Phase II get about two extra weeks to prepare submissions.
- Price Breakout Schedule replaced: Version 0004 replaces version 0003, so applicants must use the new schedule for pricing.
- Specifications and drawings updated: New specification and Appendix A files (0004) replace the prior versions. Plan sheets for site and floor layouts (including Areas A, B, C.1–C.3, and the swing space and MEP lot sheets) were replaced. Only Part 01 (design objectives and functional/area requirements) and Part 16 (swing space enclosures) of the specifications changed text.
- ProjNet timing changed: The date for Government responses to offeror questions was adjusted in the instructions.
- Why it matters: Applicants should re-price using the 0004 breakout schedule, revise designs against the updated area and swing-space requirements, and plan around the later deadline. The amendment also requires acknowledgment of all amendments before the closing time, or the offer may be rejected.
Critical change · Deadline + Requirements + Attachment + Scope + Submission + Description
Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX
- Performance period corrected: Amendment 0003 changes the completion period to 961 calendar days after Notice to Proceed (Block 11 and Supplementary Conditions). Amendment 0002 had not stated a specific figure in the text shown, so applicants should confirm the schedule they planned against.
- Proposal due date unchanged in this version: Amendment 0002 had moved Phase II proposals to 20 November 2026 at 2:00 p.m. ET. Amendment 0003 notes a time-zone correction from Eastern Daylight to Eastern Standard Time, which shifts the deadline's local clock reading; confirm the exact time zone before submitting.
- Price breakout schedule replaced: Section 00 10 00 is fully replaced, so pricing must follow the new format.
- Submission and evaluation criteria for Phase II replaced: Section 00 22 18 is rewritten, with changes marked in red in the separate document. Proposal structure and scoring should be re-checked against it.
- Technical specifications and plan sheets revised: Several design-objective, site civil, electrical, architectural, thermal, fire protection, and MEP specification sections, plus about a dozen plan sheets, were replaced. Design responses must reflect the new requirements.
- New brand-name justifications added: Justifications for Daikin HVAC chillers and Monaco fire alarm equipment are now attachments, which may limit competition for those components.
- Wage determination changed: A highway Davis-Bacon determination (TX20260291) was added to replace the heavy determination in Amendment 0002's list, affecting labor cost estimates.
- Acknowledgment required: Offerors must acknowledge this amendment or risk rejection.
Critical change · Deadline
Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX
The open date moved from September 22, 2026 to October 19, 2026, a shift of 27 days later. Applicants get no earlier start and have 27 fewer days before the application window opens, so teams that planned to begin drafting or submitting in late September should re-plan for mid-October. Because the close date is not shown as changed, the window itself may be shorter if the closing date remains fixed, so check the closing date in the full solicitation before adjusting internal timelines.
Critical change · Deadline
Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX
The close date moved from October 22, 2026 to November 20, 2026, a shift of 29 days later. Applicants now have roughly four more weeks to prepare and submit their proposals, which eases timing pressure on drafting, internal review, and budget sign-off. Teams that had planned around the October deadline should re-baseline their schedules, but should not assume the extension changes any other requirement in the solicitation.
Critical change · Deadline + Requirements + Attachment + Scope + Description
Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX
- Proposal due date extended from 22 October 2026 at 2:00 p.m. ET to 20 November 2026 at 2:00 p.m. ET for Phase II offerors. This gives more time to prepare Phase II submissions.
- Time zone label corrected from Eastern Daylight Time to Eastern Standard Time on the response due time.
- Wage determinations updated: Davis-Bacon WD TX20260291 (Highway), Modification #1, is added, and WD TX20260007 (Heavy), Modification #1, is deleted. Applicants should price labor using the building and highway determinations now listed, since labor rates and classifications may differ from the heavy determination.
Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX
New opportunity: Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX