RallyPropRallyProp.ai
W912PM27BA002ActiveOTHER

Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance Dredging

Department of DefenseW074 ENDIST WILMINGTON

AI Overview

A solicitation for maintenance dredging of the Calcasieu River Bar Channel, Pascagoula Harbor, and Panama City Harbor entrance channels, with bids due electronically through PIEE. It seeks contractors to keep these federal navigation channels at authorized depths for safe commercial and recreational vessel traffic.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
October 5, 2026
Due Date
March 31, 2027

Official Description

--- Attachment text --- [A21___Solicitation_Amendment_W912PM27BA002_0001_SF_30.pdf]

  1. CONTRACT ID CODE | PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT | J | 1 | 14
  2. AMENDMENT/MODIFICATION NUMBER | 3. EFFECTIVE DATE | 4. REQUISITION/PURCHASE REQUISITION NUMBER | 5. PROJECT NUMBER (If applicable) 0001 | 13 NOV 2026 | A050106
  3. ISSUED BY | CODE | W912PM | 7. ADMINISTERED BY (If other than Item 6) | CODE

W074 ENDIST WILMINGTON KO CONTRACTING DIVISION, 69 DARLINGTON AVENUE W...

View on official source

Change History

Description ChangedNov 16, 2026 at 4:48 PM

Critical change · Submission + Attachment + Description

Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance Dredging

  • The previous description was a PIEE vendor registration guide (how to self-register and request Proposal Manager or Proposal View Only roles in the Solicitation Module). The updated description is an SF 30 amendment (0001) to solicitation W912PM27BA002, a USACE Wilmington District maintenance dredging IFB covering Calcasieu River Bar Channel, Pascagoula Harbor, and Panama City Entrance Channel.
  • Key requirement stated in the amendment: all bids must be submitted electronically through PIEE; hand-carried bids, email, CD-ROM, and facsimile submissions are not authorized. Section 00 45 00 Representations and Certifications must be returned with the bid.
  • Performance windows are specified: Calcasieu River Bar Channel 15 Jan to 15 Apr 2027; Pascagoula Harbor 1 Apr to 30 Sep 2027; Panama City Entrance Channel 1 Aug to 30 Sep 2027.
  • Bid timing: bids due 12 Nov 2026 at 1:00 PM Eastern; bids read at 2:00 PM Eastern. Optional bid items 1 and 2 are tied to funding availability, and the note on exercising them references an outdated 2019 date, so applicants should confirm the intended exercise window.
  • Why it matters: applicants must have a PIEE account with bid submission capability, electronic signatures are allowed on SF 1442 and bid bonds, and questions must go only to the listed contracting officer contact.
Description ChangedNov 5, 2026 at 2:50 PM

Material change · Attachment + Submission + Description

Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance Dredging

  • The previous description was the full solicitation scope: three dredging projects (Calcasieu River Bar Channel, Pascagoula Harbor, Panama City Harbor), equipment depth and placement requirements, performance periods, and contacts.
  • The updated description no longer contains that scope. It is replaced by an attachment on the PIEE Solicitation Module vendor registration guide, which explains how to self-register for a PIEE account and select the Proposal Manager or Proposal View Only role needed to submit or view offers.
  • Why it matters: the dredging requirements, depths, disposal sites, and performance dates are no longer stated in the description, so applicants should check the solicitation package itself for the actual scope. Vendors wanting to submit offers through this portal should register for the Proposal Manager role in PIEE now.
Field UpdatedOct 6, 2026 at 11:39 AM

Informational change · Unknown

Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance Dredging

Title changed from the generic "Notice of Intent to Consolidate" to "Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance Dredging."

What this tells a business-development reader:

  • Scope is now identifiable. The opportunity covers maintenance dredging at three Gulf Coast navigation projects: the Calcasieu River bar channel (Louisiana), Pascagoula Harbor (Mississippi), and Panama City Harbor (Florida). The old title gave no clue about the work, location, or trade.
  • Consolidation is the likely structure. The original title suggests these separate dredging requirements are being combined into one solicitation. Bidders should expect a single, larger multi-site award rather than separate contracts. That affects bonding capacity, equipment mobilization, and teaming or joint-venture decisions.
  • Relevance screening. Dredging contractors, especially those with hopper dredges or Gulf operations, can now find this in searches and judge fit.

The title edit alone doesn't change eligibility, dates, amounts, or submission rules. Check the notice description and attachments for the actual consolidation details, schedule, and any set-aside status before deciding to pursue it.

Description ChangedOct 6, 2026 at 11:39 AM

Informational change · Description

Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance Dredging

  • Consolidation rationale removed: The RFO 7.107-3 consolidation language (three contracts consolidated, "performed by a large business," benefits justification) is gone. The notice now simply says the solicitation is unrestricted.
  • Project name changed: "Panama City Entrance Channel" is now "Panama City Harbor."
  • Dredge requirements added:
    • Calcasieu River Bar Channel: one fully crewed, self-propelled trailing suction hopper dredge, to -45 ft MLLW, placing material in the ODMDS.
    • Pascagoula Harbor: hopper dredge, to -46 ft MLLW, placing material in the Pascagoula ODMDS, typically 3–5 miles from the cut.
    • Panama City Harbor: medium to small hopper, to -40 ft MLLW, placing material in the channel adjacent to the entrance jetty, typically within 1 mile.
  • Performance periods added: Calcasieu from 15 Jan 2027 (end TBD); Pascagoula 1 Apr–30 Sep 2027; Panama City 1 Aug–30 Sep 2027.
  • Contract terms added: Firm Fixed Price. NAICS 237990 with a $37M size standard. Electronic-only solicitation, expected on or about 23 Oct 2026, with the bid opening date to be set in the solicitation. SAM registration is required.

Why it matters: Bidders can now size their fleet and schedule

Date ChangedOct 6, 2026 at 11:39 AM

Critical change · Deadline

Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance Dredging

Deadline changed from close_date: 2026-10-12 to close_date: 2027-03-31.

Opportunity AddedOct 5, 2026 at 6:39 PM

Notice of Intent to Consolidate

New opportunity: Notice of Intent to Consolidate

Similar Opportunities

Get Alerts for Opportunities Like This

RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.

Build Your Free Lane