W912PM26QA041ClosedCONTRACT

Philpott Restroom Replacement

Department of DefenseW074 ENDIST WILMINGTON

AI Overview

DoD seeks a contractor to design and build replacement restroom facilities at Philpott. The project involves constructing new waterborne restroom buildings with 2,000-gallon holding capacity at multiple sites, with the Government handling demolition of existing structures.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
September 17, 2026
Due Date
October 9, 2026 (Closed)

Official Description

--- Attachment text --- [A21___Solicitation_Amendment_W912PM26QA0410002_SF_30.pdf] 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copi...

View on official source

Change History

Status ChangedOct 9, 2026 at 7:38 PM

Informational change · Status

Philpott Restroom Replacement

The solicitation's status changed from open to closed. Applicants can no longer submit proposals through this opportunity, so any work on an application for this round should stop. If you have a draft, check whether the agency has announced a successor solicitation or a reopening, and monitor the funding portal for a new notice. Any plans that depended on submitting under this announcement should be redirected to other open opportunities or to the next cycle.

Description ChangedOct 6, 2026 at 11:38 AM

Informational change · Description

Philpott Restroom Replacement

The description now holds Amendment 0002 (issued 5 Oct 2026) in place of Amendment 0001 (17 Sep 2026). It contains a Q&A document and no longer shows the revised instructions to offerors.

  • Amendment purpose: Amendment 0001 set the 28 Sep 3pm question deadline and a 23 Sep 9am Philpott Lake site visit. Amendment 0002 only provides questions and answers. No due-date extension is shown in the visible text.
  • Existing buildings: The Government will demolish the existing restrooms before contractor start. The contractor does no demolition, vault pumping, or disposal. The existing facilities are waterborne with no vault tanks, so the site will be at ground level.
  • Design information: No pre-existing drawings or site plans are available. The contractor must locate and protect all utilities under FAR 52.236-9. The Government can only give best-estimate utility locations.
  • Vault capacity: The PWS (2.4.7.8) requires at least 2,000 gallons total per restroom building, at each location.
  • Subgrade: 1,500 PSF is the minimum soil-bearing capacity of the final subgrade, not a compaction spec. The contractor chooses lifts and methods to achieve it.
  • Grading: The Government wants positive drainage from the slab, out the door, across the asphalt, and away from the building. The transition must be smooth with no tripping hazard and must meet accessibility standards. The contractor owns the design of sl
Description ChangedSep 22, 2026 at 5:57 PM

Informational change · Description

Philpott Restroom Replacement

Description information changed.

Opportunity AddedSep 21, 2026 at 11:22 PM

Philpott Restroom Replacement

New opportunity: Philpott Restroom Replacement

Similar Opportunities

Get Alerts for Opportunities Like This

RallyProp monitors thousands of funding sources and sends instant alerts when opportunities match your technology and capabilities.

Start Free Trial