This solicitation closed on November 18, 2026
View current Department of Defense opportunities →Groundwater Monitoring in Wabasha County, MN
AI Overview
USACE is seeking a contractor to perform groundwater and surface-water monitoring during dredged-material placement near Kellogg, Minnesota. The work covers pre-, active-, and post-placement sampling of project wells and nearby residential wells to establish baselines and document any changes.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
--- Attachment text --- [Grand_Encampment_SOW_2026_Amend_0001.pdf] STATEMENT OF WORK Grand Encampment Dredged-Material Placement Groundwater and Surface-Water Monitoring Near Kellogg, Wabasha County, Minnesota U.S. Army Corps of Engineers - St. Paul District Amendment 0001 changes to SOW are highlighted in green
TABLE OF CONTENTS
- General and Applicability
- Project Background and Operational Context
- Monitoring Objectives
- Required Contractor Services
- Period of Performance, Milestone...
Change History
Informational change · Status
Groundwater Monitoring in Wabasha County, MN
The solicitation's status changed from open to closed. Applicants can no longer submit proposals through this opportunity, so any work on a submission for this round should stop. Teams that had planned to apply should check whether a follow-on or reissued announcement is expected, and monitor the funding agency's listings for a new posting. If you have questions about the outcome or a possible resubmission window, contact the program office listed in the original announcement.
Material change · Requirements + Attachment + Description
Groundwater Monitoring in Wabasha County, MN
The amendment (0001) is marked with green highlights for changed text, but the extracted text we have is truncated before the highlighted sections, so the specific substantive edits cannot be fully identified from the visible portions. Both versions share the same structure, table of contents, appendix list, and opening sections, and the visible text is essentially identical through Section 3's objectives.
What can be confirmed:
- The amended SOW is labeled "Amendment 0001" with changes highlighted in green, so the document was revised and the amendment's content lies in the portions cut off in the extract.
- The visible sections (general applicability, operational separation of monitoring programs, and the public-health review objective tied to Appendix K well screening) are unchanged in wording.
Why it matters for applicants: the amendment likely affects scope items such as sampling, analytical, or reporting requirements. Applicants should open the full Amendment 0001 document, review the green-highlighted passages, and check whether pricing, sample quantities, or deliverables changed before finalizing a proposal.
Material change · Scope + Requirements + Description + Deadline
Groundwater Monitoring in Wabasha County, MN
I compared the two attachment texts and the visible portions appear identical; the sections shown (general applicability, project background, operational separation, and monitoring objectives through the public-health bullet) match word for word apart from line-break and spacing differences. The updated text is cut off at the end of the public-health objective, so I cannot confirm whether any changes exist in the truncated remainder of the SOW (sections 4 through 15 and the appendices).
No substantive change was made to the description field in the portions I can compare.
Groundwater Monitoring in Wabasha County, MN
New opportunity: Groundwater Monitoring in Wabasha County, MN
Similar Opportunities
Get Alerts for Opportunities Like This
RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.
Build Your Free Lane