This solicitation closed on October 14, 2026
View current Department of Defense opportunities →Crane LMI System, Barge Integration and Components Installation
AI Overview
Load Moment Indicator (LMI) system replacement and installation for a Link-Belt 218 crawler crane operating on a Mississippi River barge. The project involves removing existing safety systems and installing new hardwired boom line, wireless whip line, and anti-two-block safety components with unified cab display integration.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
--- Attachment text --- [Solicitation_Amendment_W912ES26QA1120002_SF_30.pdf] 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of ...
Change History
Critical change · Deadline + Eligibility + Scope + Requirements + Description + Attachment
Crane LMI System, Barge Integration and Components Installation
- Set-aside removed: The solicitation was previously a 100% small business set-aside (size standard 1,250 employees). The earlier amendment (Amendment 0001) already reissued it as unrestricted, and the small business clause (FAR 52.219-6) was deleted, so the procurement is now open to all bidders.
- HUBZone preference added: FAR 52.219-4 (HUBZone price evaluation preference, 10% price factor) was added, with a waiver option and a joint-venture 40% work requirement for HUBZone partners.
- Scope rewritten (Statement of Work): The previous hybrid configuration is removed. The wireless whip line system and cone wire rider are deleted, and a line rider system is added in their place. Applicants should re-scope any sensor, wiring, or integration pricing that assumed wireless whip line components.
- Response due date extended: Quotes are now due 20 Oct 2026, up from 14 Oct 2026.
Why it matters: Large businesses can now compete, which raises competition on price. Small and HUBZone firms should note the 10% evaluation preference. Technical proposals must be rebuilt around the line rider system, with the earlier wireless design no longer applicable.
Informational change · Unknown
Crane LMI System, Barge Integration and Components Installation
The open date moved from September 10, 2026 to September 29, 2026, a delay of 19 days (about 2.5 weeks).
Why it matters for applicants:
- The application window now starts later. No close date change is reported, so if the deadline stays fixed, the total submission window is 19 days shorter. Check the listing to confirm the close date.
- Applicants can't submit before September 29. Anyone planning to file on or soon after September 10 should reset their internal timelines.
- The delay gives extra time to prepare, such as finalizing the narrative, budget, partnerships, and registrations (SAM.gov, Grants.gov). That only helps if the close date also holds or moves later.
- Watch for a follow-up amendment that may adjust the close date or other terms.
Recommended action: Confirm the current close date, and update your proposal calendar and go/no-go milestones to reflect the September 29 opening.
Critical change · Deadline
Crane LMI System, Barge Integration and Components Installation
The close date moved from September 25, 2026 to October 14, 2026, a 19-day extension (about 2.5 weeks). Applicants have more time to respond.
Why it matters:
- Teams that were behind on narratives, budgets, or required attachments now have extra time to finish them.
- It leaves room to line up partners, subawards, letters of commitment, and other third-party documents.
- Organizations that had ruled the opportunity out because of the original timeline may be able to reconsider.
- Expect the pool of applicants to grow, which may mean more competition.
Next steps:
- Confirm the new deadline on the official listing, including the time zone and any change to the submission portal cutoff.
- Verify that SAM.gov and Grants.gov registrations will stay active through the new close date.
- Don't treat the extra time as a reason to ease off. Agencies sometimes extend a deadline only once.
The change notice lists no other modifications, so the funding amount, eligibility, and requirements appear unchanged.
Informational change · Description
Crane LMI System, Barge Integration and Components Installation
Description information changed.
Informational change · Status
Crane LMI System, Barge Integration and Components Installation
Status changed from status: open to status: closed.
Material change · Description + Attachment + Scope
Crane LMI System, Barge Integration and Components Installation
The opportunity description was replaced with full solicitation document text, significantly expanding scope and adding formal contract/submission details including offer due date, WOSB designation, and solicitation terms.
Crane LMI System, Barge Integration and Components Installation
New opportunity: Crane LMI System, Barge Integration and Components Installation
Similar Opportunities
Sources Sought Notice: Cape May Railroad Dredged Material Placement Facility (DMPF) Maintenance Repairs
Due December 2, 2026
ForecastPM Support Contract
Due December 7, 2026
ActiveThomas J O Brien Lock and Dam Major Rehabilitation - Construction, Chicago, Cook County, Illinois
Due November 27, 2026
Get Alerts for Opportunities Like This
RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.
Build Your Free Lane