W912BV26RA033ClosedCONTRACT

Arcadia Wet Well Rehabilitation

Department of DefenseW076 ENDIST TULSA

AI Overview

Seeks a contractor to rehabilitate the wet well at Arcadia Dam in Oklahoma, a civil engineering repair for a flood-control facility. This is a conventional construction solicitation with an amended as-built drawing and an extended proposal deadline of 23 November 2026.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
September 24, 2026
Due Date
November 9, 2026 (Closed)

Official Description

--- Attachment text --- [Amendment_0005_Arcadia_Wet_Well_Rehab_19_Nov_2026.pdf]

  1. CONTRACT ID CODE | PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT | J | 1 | 2
  2. AMENDMENT/MODIFICATION NUMBER | 3. EFFECTIVE DATE | 4. REQUISITION/PURCHASE REQUISITION NUMBER | 5. PROJECT NUMBER (If applicable) 0005 | 19 NOV 2026 | CY801
  3. ISSUED BY | CODE | W912BV | 7. ADMINISTERED BY (If other than Item 6) | CODE

W076 ENDIST TULSA KO CONTRACTING DIVISION, 2488 E 81ST STREET TULSA, OK 74137...

View on official source

Change History

Description ChangedNov 19, 2026 at 9:48 PM

Critical change · Deadline + Submission + Attachment + Description

Arcadia Wet Well Rehabilitation_Amendment 0005

  • Amendment 0005 replaces Amendment 0004 (the description attachment), with the substantive change being an updated as-built drawing. The prior version's Section 35 20 16.54 Paragraph 2.3 text on electric motor-driven gate actuators (AGMA 6010, AWWA C560-21 Appendix A, NEMA MG 1, 240V 3-phase, NEMA Type 4 enclosures, handwheel requirements) was amended in 0004 but is not restated in the 0005 attachment; the 0005 attachment itself mainly carries the title block and a drawing sheet (Grating and Framing Details, R-207).
  • Response due date moved from 20 November 2026 to 23 November 2026 at 2:00 PM CDT. Applicants gain three days to submit proposals.
  • All other terms and conditions are stated as unchanged.
Description ChangedNov 13, 2026 at 4:46 PM

Critical change · Deadline + Attachment + Description + Requirements

Arcadia Wet Well Rehabilitation_Amendment 0004

  • Proposal due date moved again: Amendment 0002 had set the due date to 9 November 2026 at 2:00 PM CDT. Amendment 0004 pushes it to 20 November 2026 at 2:00 PM CDT, roughly 11 days later.
  • Technical specifications replaced: Amendment 0004 updates Section 35 20 16.54 (Rehab Wetwell-Low Flow Gates, Arcadia Dam), replacing Paragraph 2.3 on the electric motor-driven gate actuator. Changes are flagged with "AM0004" markers.
  • Actuator requirements in the revised paragraph include: new electric actuators compatible with the new gate; a gate travel speed of about 1 foot per minute; design to AGMA 6010; actuation force calculations per AWWA C560-21 Appendix A; continuous-duty motors meeting NEMA MG 1 with winding space heaters; NEMA Type 4 enclosures on cast iron pedestals; helical and worm gearing with specified materials; and a 240 V, 3-phase, 60 Hz power supply.
  • Why it matters: Bidders must price and design actuators to these parameters, and should review the updated as-built drawings and specifications before the new deadline. Any proposal prepared against Amendment 0002's specifications may need revision.
Status ChangedNov 9, 2026 at 7:48 PM

Informational change · Status

Arcadia Wet Well Rehabilitation

The solicitation's status changed from open to closed. Applicants can no longer submit proposals through this opportunity, so any work on an application for this round should stop. If you were planning to submit, look for a successor announcement or a related solicitation, and watch for any amendment or reopening notice before assuming another window will open.

Date ChangedOct 24, 2026 at 3:50 PM

Critical change · Deadline

Arcadia Wet Well Rehabilitation

The open date moved from September 24, 2026 to October 21, 2026, a delay of 27 days. Applicants get the opportunity to begin submitting later than previously planned, but the change does not by itself shorten the response window if the close date stayed the same. Businesses should re-check their proposal timelines, since any internal drafting, teaming, or registration work scheduled around the earlier opening should be pushed back accordingly. Because the close date was not reported as changed, the effective preparation period is now roughly four weeks shorter, which matters for teams that need lead time for capability statements or partner agreements.

Date ChangedOct 24, 2026 at 3:50 PM

Critical change · Deadline

Arcadia Wet Well Rehabilitation

The close date moved later, from October 26, 2026 to November 9, 2026. That is a shift of 14 days (two weeks), so applicants gain two additional weeks to submit.

Why it matters for applicants:

  • More time to finalize proposals, budgets, and required certifications.
  • Teams planning around the original October deadline should re-sequence internal reviews, partner commitments, and any upcoming submission milestones.
  • Questions submitted to the contracting or program office should be checked against the new timeline, since response windows may also have shifted.
Description ChangedOct 21, 2026 at 3:48 PM

Critical change · Deadline + Attachment + Description

Arcadia Wet Well Rehabilitation

  • The response due date moved from 19 October 2026 (Amendment 0001) to 26 October 2026 in the prior version, and this amendment extends it again to 9 November 2026 at 2:00 PM CDT (the 26 October 2:00 PM CDT deadline is replaced).
  • The pre-bid site visit on 14 October 2026 at 11:00 AM CDT at 9000 E 2nd Street, Arcadia, OK, from Amendment 0001, is no longer the only scheduling change; the new amendment itself makes no other scope changes.
  • All other terms and conditions remain unchanged.

Why it matters: applicants gain roughly two extra weeks to prepare and submit proposals, so teams should update internal timelines and calendar the new 9 November 2026, 2:00 PM CDT deadline, while still acknowledging amendments as required to avoid rejection.

Description ChangedOct 8, 2026 at 2:38 PM

Informational change · Description

Arcadia Wet Well Rehabilitation

  • A pre-bid site visit was added for October 14, 2026, at 11:00 a.m. CDT. Attendees should meet at the access-road entry gate at 9000 E 2nd Street, Arcadia, OK 73007.
  • The response due date moved from October 19 to October 26, 2026, giving applicants an additional week to submit. All other terms and conditions remain unchanged.
Opportunity AddedSep 24, 2026 at 2:46 PM

Arcadia Wet Well Rehabilitation

New opportunity: Arcadia Wet Well Rehabilitation

Similar Opportunities

Get Alerts for Opportunities Like This

RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.

Build Your Free Lane