W912BV26RA016ClosedCONTRACT

Child Development Center (CDC), Tinker Air Force Base, Oklahoma

Department of DefenseW076 ENDIST TULSA

AI Overview

A construction solicitation for a new Child Development Center at Tinker Air Force Base, Oklahoma, including quality control requirements and telecommunications and Wi-Fi infrastructure (22 wireless access point locations). This is a standard facilities construction procurement rather than a technology development opportunity.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
September 4, 2026
Due Date
November 13, 2026 (Closed)

Official Description

--- Attachment text --- [Solicitation_Amendment_0004__W912BV26RA016.pdf] 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amen...

View on official source

Change History

Description ChangedNov 17, 2026 at 9:46 PM

Critical change · Deadline + Scope + Requirements + Attachment + Description

Child Development Center (CDC), Tinker Air Force Base, Oklahoma

  • Proposal due date unchanged in this amendment: Amendment 0004 explicitly states the proposal is not extended; proposals remain due 3:00 PM CT, Tuesday, 01 December 2026 (the prior amendment had moved it from 13 Nov 2026).
  • Section 01 45 00 Quality Control replaced in its entirety: The revised section (dated 11-17-2026) sets the Contractor Quality Control (CQC) Plan and Certificate of Readiness as government-approval submittals, and ties the QC system to RFO 52.246-12 Inspection of Construction. Applicants should review it for the updated QC plan and organization requirements, which affect cost pricing.
  • Telecommunications sheets T-111 to T-114 get a new general note: Bidders must provide telecom work per UFC 3-580-01, including cable television infrastructure and Wi-Fi infrastructure.
  • Wireless access point requirement added: Estimates must include 22 WAP outlet locations (18 in child activity rooms, 4 in common and administrative zones). Each needs a flush-mounted ceiling junction box, 1-inch conduit with pull string, and two Category 6 cables terminated in Room 139.

Why it matters: The 22 WAP locations and QC section changes are scope items that directly affect bid pricing. Applicants should update estimates before the 1 December deadline.

Description ChangedNov 6, 2026 at 5:52 PM

Critical change · Deadline + Requirements + Scope + Submission + Attachment + Description

Child Development Center (CDC), Tinker Air Force Base, Oklahoma

  • Proposal due date extended twice: from 30 Oct 2026 to 13 Nov 2026 (Amendment 0002), then to 1 Dec 2026 (Amendment 0003).
  • Evaluation criteria and basis of award updated in Section 00 22 16 in both amendments; applicants should review the revised scoring.
  • Construction period of performance increased from 732 to 1,062 calendar days (Amendment 0002), a significant schedule change for planning staffing and bonding.
  • New FAR provisions and clauses added in Amendment 0002: biobased product certification, recovered material certification, biobased reporting, and recovered material content estimates. Bidders must certify and report accordingly.
  • Added AI statement to Section 00 73 00 and revised quality control requirements (Section 01 45 00, QC Manager qualifications).
  • Added reports: a 24-page pre-demolition asbestos and lead-paint survey for the utility tunnel, and an 80-page final environmental assessment, both to be reviewed in preparing proposals.
  • Transition from RMS to CMP and FAR to RFO: Amendment 0003 replaces numerous Division 01 and related specifications. Bidders must price all transition costs (training, software access, data migration, procedure changes) into their bids, with no separate compensation.
  • "Big Voice" relocation work removed and "Proposal Order of Precedence" removed from Section 00 73 00.
  • Drawings and equipment: several foundation, signage, interior, and architectural sheets replaced; new temporary living facility floor plans and a CDC equipment matrix added.
Date ChangedOct 24, 2026 at 3:51 PM

Critical change · Deadline

Child Development Center (CDC), Tinker Air Force Base, Oklahoma

The open date moved from September 4, 2026 to October 16, 2026, a shift of 42 days later. Applicants gain about six weeks before the opportunity opens for submissions, so teams have more time to prepare proposals, but they should also re-plan any internal milestones, partner commitments, or budget timing that were built around the earlier September start.

Date ChangedOct 24, 2026 at 3:51 PM

Critical change · Deadline

Child Development Center (CDC), Tinker Air Force Base, Oklahoma

The close date moved from October 30, 2026 to November 13, 2026, a shift of 14 days later. Applicants gain two extra weeks to prepare and submit their applications. Teams that had planned around the original deadline can relax their schedule, but should still confirm any internal review or signature timelines against the new date.

Description ChangedOct 16, 2026 at 6:44 PM

Critical change · Deadline + Scope + Requirements + Attachment + Description

Child Development Center (CDC), Tinker Air Force Base, Oklahoma

  • Proposal due date extended: from 30 October 2026 (3:00 PM CT) to 13 November 2026 (3:00 PM CT), per the Block 14 summary and the Section 00 00 00 response-date table.
  • Period of performance lengthened: construction completion time in Section 00 73 00 raised from 732 to 1,062 calendar days, so bidders must reflect the longer schedule in pricing and staffing plans.
  • New FAR provisions and clauses added: 52.223-1 (Biobased Product Certification), 52.223-4 (Recovered Material Certification), 52.223-2 (Reporting of Biobased Products), and 52.223-9 (Estimate of Recovered Material Content), requiring certifications and reporting.
  • AI statement added to Section 00 73 00 and a revised Quality Control Manager qualifications section (01 45 00, page 8).
  • Evaluation criteria and CLIN pricing schedule notes updated (Sections 00 22 16 and 00 10 00), which affects how offers are scored and priced.
  • New reference reports added: a 24-page Pre-Demolition Asbestos and Lead-Containing Paint Survey for the utility tunnel, and an 80-page Final Environmental Assessment for the new Child Development Center.
  • Drawing sheets revised: foundation plans and sections (S-100 through S-104, S-501, S-503, S-504) and signage and room schedules (IG601, IN601), all dated 10-06-2026.
  • Transition notice: USACE is moving from RMS to the Construction Management Platform during contract performance; contractors remain responsible for existing reporting and submittal requirements.

Why it matters: applicants need more time to plan, must price a longer schedule, must address new environmental and sustainability certifications, and should review the revised drawings and reports before submitting.

Description ChangedSep 29, 2026 at 9:42 PM

Informational change · Description

Child Development Center (CDC), Tinker Air Force Base, Oklahoma

Description information changed.

Description ChangedSep 22, 2026 at 6:06 PM

Material change · Description + Attachment + Requirements

Child Development Center (CDC), Tinker Air Force Base, Oklahoma

The opportunity description was replaced with solicitation form content and an attached PDF document, significantly changing the presentation of submission requirements and contract terms.

Opportunity AddedSep 21, 2026 at 11:23 PM

Child Development Center (CDC), Tinker Air Force Base, Oklahoma

New opportunity: Child Development Center (CDC), Tinker Air Force Base, Oklahoma

Similar Opportunities

Get Alerts for Opportunities Like This

RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.

Build Your Free Lane