RallyPropRallyProp.ai
W912BU26RA031ActiveCONTRACT

3389 Large Class Hopper Dredge (LCHD-ESS)

Department of DefenseW2SD ENDIST PHILADELPHIA

AI Overview

DoD seeks a Large Class Hopper Dredge replacement vessel with advanced station-keeping capabilities, cyber resilience certification, and high-volume sediment loading performance for coastal navigation channel maintenance.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
September 1, 2026
Due Date
March 15, 2027

Official Description

--- Attachment text --- [3389_LCHD_ESS_RFI_Group__1_Responses___AMD_0003.pdf] RFI Group 1

  1. Can the USACE confirm that the Summary Section is considered front matter and is excluded from the page count? All pages submitted will be counted in the page calculations, except for Past Performance Questionnaires, CPARS records, Preliminary Design Report, letters of commitment, Joint Venture agreement or other teaming agreement, and catalog cut sheets.
  2. Offeror assumes the CMMC level required...
View on official source

Change History

Description ChangedOct 7, 2026 at 6:38 PM

Informational change · Description

3389 Large Class Hopper Dredge (LCHD-ESS)

  • Proposal page count: All submitted pages count, except past-performance questionnaires, CPARS records, the Preliminary Design Report, commitment and teaming letters/agreements, and catalog cut sheets. The Summary Section is not exempt.
  • Cybersecurity: USACE confirmed CMMC Level 2 (Self) is required for systems handling FCI or CUI during the contract.
  • Pricing format: Excel is required only for price-breakdown information supporting EPA documentation—not for every Section B price breakdown.
  • Cyber Resilience classification: The Section H drawings/documents for the ABS Cyber Resilience notation must go to both the Government and ABS for review and approval. USACE will correct the duplicate drawing number, add the CR notation to Section C, and list deliverables in C004.
  • Dredging performance assumptions: For material properties, use the Overall Average grain-size distribution for Columbia River Mile 03–103 in the cited soil-classification document (page 9). Loading-time analysis must account for draft changing from hopper-empty to 6,500 cubic yards of 1.8-SG material.
  • Station-keeping and pipeline operation: Questions about holding position in cross-currents and orienting with the current are referred to C002 clarifications and modifications; the response excerpt does not state the exact revised operating criteria. Applicants should check revised C002 before selecting thruster arrangements.
Description ChangedSep 22, 2026 at 6:09 PM

Material change · Description + Scope + Requirements

3389 Large Class Hopper Dredge (LCHD-ESS)

Amendment 002 added detailed technical specifications and operational requirements for the Large Class Hopper Dredge replacement vessel, including capacity, propulsion system, Jones Act compliance, and mission parameters.

Opportunity AddedSep 21, 2026 at 11:24 PM

3389 Large Class Hopper Dredge (LCHD-ESS)

New opportunity: 3389 Large Class Hopper Dredge (LCHD-ESS)

Similar Opportunities

Get Alerts for Opportunities Like This

RallyProp monitors thousands of funding sources and sends instant alerts when opportunities match your technology and capabilities.

Start Free Trial