RallyPropRallyProp.ai

This solicitation closed on November 17, 2026

View current Department of Defense opportunities →
W9123826BA013ClosedCONTRACT

USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA

Department of DefenseW075 ENDIST SACRAMENTO

AI Overview

Seeks a contractor to replace discharge pipes at the Natomas Named Pumping Plants in Sacramento, California, supporting flood control infrastructure for the American River Common Features project. The work relies on established construction methods, with geotechnical borrow material data provided to support the build.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
September 18, 2026
Due Date
November 17, 2026 (Closed)

Official Description

--- Attachment text --- [B08___W9123826BA013_A08___GDR_Airport_Stockpile___Natomas_NPP___20261021.pdf] Cover Sheet Geotechnical Data Report

(GDR) 

Borrow Data for Airport Stockpile 2

American River Common Features (ARCF) – Natomas Basin

Named Pumping Plants Discharge Pipes Replacement Project

Sacramento, California

October 2026

i Table of Contents

Page

General Statement ..................................................

View on official source

Change History

Date ChangedNov 4, 2026 at 1:52 PM

Critical change · Deadline

USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA

The open date moved from September 18, 2026 to November 2, 2026, a delay of about six weeks (45 days). Applicants get roughly six weeks later access to submit, so the window opens later than previously planned. Business-development teams should push back internal prep timelines, but should also note that any downstream deadlines tied to the open date (such as close date or question deadlines, if they remain unchanged) may now leave a shorter application window than originally scheduled.

Date ChangedNov 4, 2026 at 1:52 PM

Critical change · Deadline

USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA

The close date moved later, from November 3, 2026 to November 17, 2026. That is a two-week (14-day) extension, so applicants have more time to submit. Teams that had planned to finish by November 3 can now use the extra two weeks for drafting, budget review, and internal approvals, but should not treat the new date as a reason to delay preparation if their timeline was already tight.

Description ChangedNov 2, 2026 at 10:49 PM

Informational change · Attachment + Description

USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA

  • The attachment changed from the Invitation for Bid specification package (Specification No. 2556, 100% BCOES submittal dated July 31, 2026, covering the Named Pumping Plants discharge pipes replacement, with general requirements, supplementary conditions, and drawing lists for Pritchard, Elkhorn, and Riverside pumping plants) to a Geotechnical Data Report dated October 2026 for Borrow Data for Airport Stockpile 2.
  • The new document covers a roughly 1,500-foot soil stockpile estimated at about 12,100 cubic yards, sampled by 16 hand-auger explorations (March 3-10, 2026) and tested at USACE's Prado Laboratory for geotechnical properties, plus environmental testing for heavy metals, pH, petroleum hydrocarbons, VOCs, and PCBs.
  • Why it matters: applicants should treat this as a site-characterization reference for borrow material rather than a scope or requirements change. The earlier specification's construction requirements, schedule, and restrictions are no longer in this attachment, so bidders should confirm in the solicitation whether the specification was replaced, superseded, or simply supplemented by this report.
Description ChangedSep 22, 2026 at 6:06 PM

Material change · Scope + Attachment + Description

USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA

Project scope shifted from general irrigation pumping station renovation to specific discharge pipes replacement with detailed technical specifications and drawings now embedded.

Opportunity AddedSep 21, 2026 at 11:23 PM

USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA

New opportunity: USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA

Similar Opportunities

Get Alerts for Opportunities Like This

RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.

Build Your Free Lane