W9123726RA020ClosedCONTRACT

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Department of DefenseW072 ENDIST HUNTINGTON

AI Overview

This Army Corps of Engineers solicitation seeks a contractor to rehabilitate the intake structure and dam at Fishtrap Lake in Kentucky, including replacing electrical distribution equipment, motor control systems, and gate components. It covers routine maintenance and rehabilitation of existing infrastructure rather than new technology development.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
September 21, 2026
Due Date
November 6, 2026 (Closed)

Official Description

--- Attachment text --- [A_03_09_Specifications.pdf] Specifications for INTAKE STRUCTURE AND DAM REHAB, FISHTRAP LAKE, FISHTRAP, KY. DEPARTMENT OF THE ARMY HUNTINGTON DISTRICT, CORPS OF ENGINEERS HUNTINGTON, WEST VIRGINIA March 2026 RCA RFP Contract Number

This page was intentionally left blank for duplex printing.

Fishtrap Lake Intake Structure and Dam Rehab FRL06 PROJECT TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS 01 11 00 SUMMARY OF WORK 01 14 00 WORK RESTRICTIONS 0...

View on official source

Change History

Date ChangedOct 24, 2026 at 3:49 PM

Critical change · Deadline

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

The open date moved from September 21, 2026 to October 23, 2026, a shift of 32 days later. Applicants get a later start to the submission window, so they have about a month more lead time before applications can be filed, though the overall response period depends on the close date, which this change does not address. Business-development readers should adjust internal proposal timelines and teaming plans accordingly.

Date ChangedOct 24, 2026 at 3:49 PM

Critical change · Deadline

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

The close date moved later, from October 16, 2026 to November 6, 2026. That is a shift of 21 days, so applicants gain three additional weeks to prepare and submit.

Why it matters for applicants:

  • More time to finalize the proposal, budget, and any required registrations or certifications before the deadline.
  • Planning around the original October date should be revised; teams that had internal submission targets tied to October 16 can relax those timelines.
  • Because the deadline is now in early November, check whether any other solicitation milestones (such as question cutoffs or award timing) have also shifted, since a close-date change does not necessarily move those.
Description ChangedOct 23, 2026 at 9:48 PM

Critical change · Deadline + Scope + Submission + Description

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

  • The attached solicitation document was replaced: the previous version was an SF-30 amendment (W9123726RA020, Amendment 0002) that extended the response due date from 16 Oct 2026 to 6 Nov 2026, changed the time zone from Eastern Daylight to Eastern Standard Time, and moved the organized site visit from 3 September 2026 to 22 October 2026.
  • The current attachment is a different document: the March 2026 project specifications for the Fishtrap Lake Intake Structure and Dam Rehab (FRL06), Huntington District, Corps of Engineers.
  • Applicants should note the specifications describe the scope: a base contract (removing and replacing the intake air circulator and water pump, roof damper motor, sluice gate level monitors, shafts and bearings, motor control center, wiring, E-Stop circuits, and electrical distribution equipment) plus four options covering gate cylinder rehab or replacement (Options 1 and 4, which are mutually exclusive), crane rehab (Option 2), and elevator rehab (Option 3).
  • Option 1 must be awarded alongside the base contract, while Option 4 is awarded only in lieu of Option 1.
  • Because the amendment's deadline and site-visit changes no longer appear in this text, confirm those dates directly on the solicitation before planning submissions.
Description ChangedOct 9, 2026 at 7:38 PM

Critical change · Deadline + Submission + Attachment + Description

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

  • Response due date moved from 16 Oct 2026 to 06 Nov 2026, and the time zone changed from Eastern Daylight Time (UTC -4) to Eastern Standard Time (UTC -5). Note the earlier amendment had moved the deadline from 25 Sep to 16 Oct, so this is a second extension.
  • Site visit date changed from 03 Sep 2026 to 22 Oct 2026 in Section 00 21 00 (Instructions), still at 10:00 a.m. Eastern at Fishtrap Lake, 2204 Fishtrap Road, Shelbiana, Kentucky. The amendment describes this as an additional site visit.

Why it matters: Applicants have more time to prepare proposals, but the site visit now falls about two weeks before the new deadline, so firms planning to attend need to adjust travel and scheduling. Because the time zone also shifted, confirm the exact submission cutoff in PIEE, since the deadline is recorded there.

Description ChangedSep 22, 2026 at 6:00 PM

Informational change · Description

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Description information changed.

Opportunity AddedSep 21, 2026 at 11:23 PM

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

New opportunity: Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Similar Opportunities

Get Alerts for Opportunities Like This

RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.

Build Your Free Lane