Seeking a contractor to replace the structural standing seam metal roof on the Mosquito Creek Lake control tower. The work covers furnishing bonds, labor, equipment, and supervision per the specifications and drawings.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
--- Attachment text --- [W911WN26QA062_Amendment_0001.pdf] 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b)...
Change History
Informational change · Status
Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement
The solicitation's status changed from open to closed. Applicants can no longer submit proposals through this opportunity, so any work on an application for this round should stop. If you have a draft in progress, check whether the agency has posted a successor notice, amendment, or next cycle. Otherwise, shift attention to other open funding opportunities or to a future release of this program, and track the agency's listing for a reopening or a new announcement.
Critical change · Deadline
Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement
The open date moved from September 24, 2026 to October 23, 2026, a shift of 29 days later. Applicants have 29 fewer days before the opportunity opens to submit, which means the window to begin preparing applications is delayed by about a month. Business-development readers should adjust internal timelines, partner coordination, and any proposal-writing milestones that were built around the earlier September start date.
Critical change · Deadline
Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement
The close date moved from October 26, 2026 to October 30, 2026, a shift of four days later. Applicants gain four additional days to prepare and submit their responses. Teams that had planned around the October 26 deadline should update their schedules, but the extension is favorable for business-development planning, since it allows more time for proposal development, partner coordination, and internal review before submission.
Informational change · Description
Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement
- Project location changed: Moved from 2961-B Warren-Meadville Road, Cortland, OH to 1558 Wilson Sharpsville Road, Cortland, Ohio 44410. Bidders need to plan site visits and logistics for the new address.
- Quote due date extended: From 26 Oct 2026 to 30 Oct 2026 (12:00 PM ET), giving more time to prepare quotes.
- Rough magnitude of construction added: Estimated between $150,000 and $350,000, useful for sizing bonding, staffing, and pricing.
- CLIN 0001 pricing basis clarified: The Government will now pay actual linear feet (LF) at the unit price in the price schedule, rather than a fixed job lump sum as previously implied. Applicants should price the cold-formed metal framing replacement (CLIN 0002, 95 LF) carefully against actual quantities.
- Technical specification updates: Bridge rating and load requirements were added to Attachment 1 (Section 1.17), and a section reference was corrected (1.4.13.4 to 1.4.14.4). Bidders must account for bridge rating/load criteria in their structural approach.
- Drawing corrections: Minor fixes to Section B-B and C-C, including removing "MAX." from an extension dimension.
- New attachments: A Submittal Register (Attachment 5) and Laydown and Work Area plan (Attachment 6) were added, and the wage determination moved to Attachment 4. These affect submittal planning and site staging.
- Buy American and past-performance language: Buy American construction materials notice was updated, and basis-for-award wording was revised, so review these sections for compliance and evaluation changes.
Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement
New opportunity: Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement
Similar Opportunities
Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Due December 8, 2026
ActiveJohn Day Dam Powerhouse HVAC Upgrades (W9127N27BA007)
Due December 28, 2026
Active2027-2034 Wright-Patterson Air Force Base Multiple Award Construction Contract (MACC)
Due December 11, 2026
Get Alerts for Opportunities Like This
RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.
Build Your Free Lane