This solicitation closed on November 13, 2026
View current Department of Defense opportunities →NEW - FLOORING IDIQ FY27-FY30
AI Overview
The Army is seeking a flooring contractor under a multi-year IDIQ to replace and repair floors in Fort McCoy facilities, such as Building 814. The work covers standard construction and seam repair using commercially available materials like LVT and resilient rubber flooring.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
--- Attachment text --- [W911SA27BA002_Amendment_0001.pdf]
- CONTRACT ID CODE | PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT | J | 1 | 3
- AMENDMENT/MODIFICATION NUMBER | 3. EFFECTIVE DATE | 4. REQUISITION/PURCHASE REQUISITION NUMBER | 5. PROJECT NUMBER (If applicable) 0001 | 28 OCT 2026 | 4977
- ISSUED BY | CODE | W911SA | 7. ADMINISTERED BY (If other than Item 6) | CODE
W6QM MICC FT MCCOY (RC) KO DIRECTORATE OF CONTRACTIN, BLDG 1108 SOUTH R STREET FORT MCCOY, WI 54656...
Change History
Critical change · Attachment + Submission + Deadline + Description
NEW - FLOORING IDIQ FY27-FY30
- Amendment 0001 added Attachment 6 (Drawings B814) to the solicitation package for the Fort McCoy flooring IDIQ (FY27-FY30), giving bidders building-specific drawings for the seed task order.
- Answers to contractor questions were posted, clarifying:
- Bid guarantee applies only if the bid exceeds $150,000, capped at the lesser of 20% of bid price or $3 million.
- Performance and payment bonds are required at the task-order level (per FAR 52.228-15) when expected value exceeds $150,000, not at the IDIQ level.
- No minimum guarantee exists in either option year, and no typical task-order size is guaranteed.
- Davis-Bacon construction wage determination applies (Attachment 1), with certified payroll; no Service Contract Act determination applies.
- The one site visit (Oct 22, 2026) is complete, and the written-question deadline (Oct 27, 2026) has passed.
- Building 814 and the other 800-block barracks were reported clear of asbestos, so no separate asbestos sampling line is needed.
Why it matters: Bidders should budget bonding costs only for task orders above the threshold, and not assume guaranteed volume. Asbestos sampling costs are not expected for the seed building.
Critical change · Deadline
NEW - FLOORING IDIQ FY27-FY30
The open date moved from September 23, 2026 to October 14, 2026, a shift of 21 days later. Applicants get three more weeks before the opportunity opens, so the window to begin preparing and submitting is delayed by the same amount. Teams that had scheduled proposal work or partner outreach around the September date should re-plan for mid-October, while the later start may also mean the close date and review timeline shift accordingly if they are tied to the open date.
Critical change · Deadline
NEW - FLOORING IDIQ FY27-FY30
The application close date moved from October 8, 2026 to November 13, 2026, a shift of 36 days later. Applicants gain roughly five extra weeks to prepare and submit their proposals, which eases pressure on teams that were planning around the earlier deadline. Businesses that had already set internal milestones for early October should update their timelines, and those considering a bid can now plan for a more relaxed schedule with additional time for partner coordination and budget work.
Material change · Scope + Requirements + Attachment + Description + Submission
NEW - FLOORING IDIQ FY27-FY30
- Document type changed from pre-solicitation notice to the formal solicitation. The previous description was a pre-solicitation attachment stating intent to issue an Invitation for Bids under FAR Part 14, a 100% small business set-aside under NAICS 238330 ($19M size standard), a firm fixed-price single award, project magnitude of $1M to $5M, and a one-year base plus two one-year options.
- Formal solicitation W911SA27BA002 now defines the scope: providing all parts, labor, tools, equipment, materials, transportation, and supervision to repair flooring at Fort McCoy, Wisconsin, per specifications, drawings, and contract documents.
- Structure is now a set of CLINs: base-year CLINs (0001 "joint scoped" and 0002 "variable item") plus option-year CLINs (1001/1002 for OY1, 2001 for OY2), each priced as a firm fixed price per job, with Product Service Code Z2JZ.
- Task-order mechanics are specified: the period of performance (365 days) and completion days apply to individual task orders, not the overall IDIQ.
- Key bid dates set: offers due 13 November 2026 at 10:00 AM local time, with 120 calendar days for government acceptance, and a performance bond requirement noted in the form.
Why it matters: Applicants now have the actual scope, CLIN structure, and bid deadline, and must price per-job work across base and option years rather than respond to a general intent notice.
Informational change · Status
NEW - FLOORING IDIQ FY27-FY30
Status changed from open to closed. The opportunity is no longer accepting applications, so applicants who have not submitted should not prepare or submit a new application. Applicants who already submitted should monitor agency communications for updates.
NEW - FLOORING IDIQ FY27-FY30
New opportunity: NEW - FLOORING IDIQ FY27-FY30
Similar Opportunities
Get Alerts for Opportunities Like This
RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.
Build Your Free Lane