AFSBn Snow Removal
AI Overview
Snow removal and grounds maintenance services for Army Field Support Battalion facilities at Fort Drum during winter months (November–April). The contract covers snow, ice, and slush removal from building areas, parking lots, roads, and walkways with automatic service triggered at 2-inch accumulation thresholds.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
--- Attachment text --- [Attachment_1__Performance_Work_Statement_v2.pdf] SECTION 1: PERFORMANCE WORK STATEMENT PART 1 – GENERAL
- GENERAL: Provide Snow Removal of ARMY FIELD SUPPORT BATTALION(AFSBn).
1.1. SCOPE OF WORK: Provide all labor, equipment, materials, supplies, transportation, resources, and management required to remove snow, slush, and ice from driveways, parking lots, main entrances parking areas, paved roads, steps, sidewalks, and doorways at AFSBn Buildings 4530, 6000, 6...
Change History
Material change · Description + Scope + Requirements + Attachment + Submission + Deadline
AFSBn Snow Removal
- The attachment changed from the original RFQ document (W911S227QA003, combined synopsis/solicitation with a 16 October 2026 quote deadline and CLIN structure for snow removal and emergency call-in) to a Performance Work Statement (Attachment 1, v2).
- The new PWS defines scope: removal of snow, slush, and ice from driveways, parking lots, main entrances, paved roads, steps, sidewalks, and doorways at AFSBn Buildings 4530, 6000, 6050, 6020, 4525, 60, 1660, and P1240, per a Snow Removal Map (Attachment 2). Performance runs 01 November through 30 April.
- New service triggers: automatic removal when accumulation reaches two inches, with initial work before 7:00 a.m. Eastern Monday through Friday, one additional removal during 0700-1600 if accumulation recurs, and call-in service on the COR's request after a second automatic occurrence in one day.
- Holiday work is permitted at no added cost to the Government if needed to limit accumulation.
- Grounds work is tied to core hours of 7:30 AM to 4:00 PM, Monday through Friday, with some work possibly outside those hours or on weekends; PT area restrictions apply during physical training hours.
- Personnel requirements added: a designated Project Manager reachable by phone whenever work is underway, English proficiency for staff interacting with Government personnel, and employee conduct, safety, and hazardous-material stop-work rules (contact Range Control on discovery).
- Why it matters: bidders must now price around a weather-triggered, two-inch removal standard with extended-hours exposure and fixed staffing rules, rather than the earlier CLIN-level description alone.
AFSBn Snow Removal
New opportunity: AFSBn Snow Removal
Similar Opportunities
Get Alerts for Opportunities Like This
RallyProp monitors thousands of funding sources and sends instant alerts when opportunities match your technology and capabilities.
Start Free Trial