This solicitation closed on October 25, 2026
View current Department of Defense opportunities →Propane Gas Delivery to Osan Air Base
AI Overview
A five-year contract to deliver 50 kg propane tanks to facilities at Osan Air Base in South Korea, with the contractor supplying vehicles, labor, and compliance with Korean safety and environmental rules. It covers routine, recurring fuel logistics for the base.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
--- Attachment text --- [Propane_Gas_Delivery_SOW_Revised_dated_28_Oct_2026.docx] ATTACHMENT 1
STATEMENT OF WORK
Propane Gas Delivery
28 Oct 2026
1.0 General.
The contractor shall deliver full 50 kg propane tanks quantity to designated facilities on Osan Air Base (AB). The contractor shall provide all vehicles, equipment, tools, labor, supervision, and required Republic of Korea licenses and permits necessary to transport and deliver propane in accordance with applicable Korean safety regu...
Change History
Critical change · Requirements + Submission + Scope + Description
Propane Gas Delivery to Osan Air Base
- The description attachment was replaced: the prior version was the combined synopsis/solicitation notice (RFQ W90VN6-27-Q-1CQ7) with ROK licensing, KRW pricing, and FAR clause requirements, while the updated version is a Statement of Work dated 28 Oct 2026 for propane tank delivery to Osan Air Base.
- New SOW requirements for applicants:
- Contractor must supply all vehicles, equipment, labor, and required Republic of Korea licenses and permits, with deliveries following Korean safety regulations.
- Five-year period of performance: a 12-month base plus four 12-month options.
- Deliveries limited to 0730–1600 KST, Monday through Friday, excluding listed U.S. federal and Korean holidays, with delivery quantity notices due within two working days.
- Personnel and vehicles must meet Osan AB access, background-check, and identity verification requirements; AT Level 1 training may be required within 30 days.
- Environmental and safety duties: immediate reporting of leaks, fires, vehicle accidents, and injuries; compliance with EM 385-1-1; written accident reports within five calendar days; contractor bears spill liability.
- Delivery tickets and monthly summary invoices must include specified data elements and be sent electronically to the Contracting Officer and COR.
- Subcontracts must flow down safety and environmental provisions.
- Why it matters: applicants now have operational, security, and reporting obligations to price in, and the removed notice-level terms (KRW-only pricing, licensing verification at quote stage) are no longer stated in this attachment.
Informational change · Status
Propane Gas Delivery to Osan Air Base
The opportunity's status changed from open to closed. Applicants can no longer submit proposals through this solicitation, so any work on an application for it should stop. If you were preparing a submission, check whether the agency has posted a replacement announcement, an amendment reopening the window, or a notice of a follow-on opportunity, and redirect effort there. If you already submitted before closing, confirm your submission receipt in the grants or contracts portal and keep it on file in case of any later agency questions.
Critical change · Deadline
Propane Gas Delivery to Osan Air Base
The open date moved from October 7, 2026 to October 19, 2026, a delay of 12 days.
For applicants, this means the window for submissions opens later, so they gain 12 more days to prepare before the solicitation becomes active. Teams that had planned to start drafting or submitting on October 7 should shift their timelines, but the overall response period to the closing date is not changed by this edit alone and should be checked against the close date.
Critical change · Deadline + Submission + Requirements + Attachment + Eligibility + Scope + Description
Propane Gas Delivery to Osan Air Base
- Statement of Work reference removed/changed: The earlier version tied the requirement to the "Statement of Work (SOW) dated 06 October 2026." The revised version simply refers to "the Statement of Work (SOW)" with no date, so applicants can no longer confirm which SOW version governs.
- Quote submission deadline added: Quotes must now be emailed to the listed points of contact no later than 11:59pm KST on 25 October 2026, as posted on SAM.gov. The earlier version gave no deadline in this section.
Why it matters: Applicants should plan to submit by 11:59pm KST on 25 October 2026 and confirm with the Contracting Officer which SOW version applies, since the dated reference was dropped.
Propane Gas Delivery to Osan Air Base
New opportunity: Propane Gas Delivery to Osan Air Base
Similar Opportunities
Get Alerts for Opportunities Like This
RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.
Build Your Free Lane