ACTIVE VEHICLE BARRIERS AND ASSOCIATED CONTROL SYSTEM AT OSAN AIR BASE
AI Overview
DoD seeks installation and integration of anti-ram active vehicle barrier systems with synchronized access control at Osan Air Base gates. Work includes demolition, civil/electrical installation, PLC programming, and fail-safe system integration across multiple security checkpoints.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
--- Attachment text --- [Solicitation_Amendment_W90VN626QA0170001_SF_30.pdf] 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of ...
Change History
Informational change · Unknown
ACTIVE VEHICLE BARRIERS AND ASSOCIATED CONTROL SYSTEM AT OSAN AIR BASE
The open (posting/application-start) date moved from September 1, 2026 to September 30, 2026, a delay of 29 days.
What it means for applicants:
- Later start: Applications will not be accepted until September 30 instead of September 1, so anyone planning to submit early has to wait almost a month longer.
- More prep time: Teams still drafting narratives, budgets, partnerships, or registrations (SAM.gov, Grants.gov) have an extra four weeks to get ready.
- Possibly less time to apply: The change record shows no close date update. If the deadline is unchanged, the application window shrinks by 29 days. Check the close date right away, because a tight window leaves little room for error or technical problems.
Action items: Update your internal timeline, confirm whether the close date or other milestones moved, and avoid leaving submission to the last days of the window.
Critical change · Deadline
ACTIVE VEHICLE BARRIERS AND ASSOCIATED CONTROL SYSTEM AT OSAN AIR BASE
The close date moved from October 1, 2026 to October 15, 2026, a 14-day (two-week) extension. Applicants have more time to respond.
Why it matters:
- Teams still drafting get two additional weeks to finish the technical narrative, budget, and any required attachments or registrations.
- Applicants who were already on track to submit by October 1 can use the added time for review and quality checks, or for strengthening partnerships and letters of support. They don't have to wait, though; early submission remains an option.
- Internal deadlines, such as review cycles, sign-offs from authorized organizational representatives, and portal submission targets, should be updated to match the new date.
Only the close date changed in this update. No other fields were modified, so requirements and scope appear unchanged. Still, confirm on the official listing that nothing else shifted, and avoid waiting until the last day to submit, since portal issues can happen close to deadlines.
Informational change · Description
ACTIVE VEHICLE BARRIERS AND ASSOCIATED CONTROL SYSTEM AT OSAN AIR BASE
Description information changed.
Material change · Scope + Requirements + Description
ACTIVE VEHICLE BARRIERS AND ASSOCIATED CONTROL SYSTEM AT OSAN AIR BASE
Detailed Performance Work Statement added specifying installation, integration, and commissioning requirements for active vehicle barriers at two gates with defined performance standards and acceptance criteria.
ACTIVE VEHICLE BARRIERS AND ASSOCIATED CONTROL SYSTEM AT OSAN AIR BASE
New opportunity: ACTIVE VEHICLE BARRIERS AND ASSOCIATED CONTROL SYSTEM AT OSAN AIR BASE
Similar Opportunities
Get Alerts for Opportunities Like This
RallyProp monitors thousands of funding sources and sends instant alerts when opportunities match your technology and capabilities.
Start Free Trial