RallyPropRallyProp.ai
W15QKN26R1C5RClosedCONTRACT

155mm Modular Artillery for Combat Effectiveness (MACE)

Department of DefenseW6QK ACC-RI-PICATINNY

AI Overview

The Army is seeking prototype manufacturing processes for a modular 155mm artillery projectile that can carry interchangeable lethal and non-lethal payloads at extended ranges. It aims to expand domestic production capacity and create a more resilient supply chain for large-caliber munitions.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
September 18, 2026
Due Date
November 30, 2026

Official Description

--- Attachment text --- [PPON_MACE_Extended_November_30__W15QKN26R1C5R__Dated_11_23__2_.docx] Prototype Project Opportunity Notice (PPON)

For

155mm Modular Artillery for Combat Effectiveness (MACE)

Solicitation Number: W15QKN-26-R-1C5R

Issued by:

U.S. Army Contracting Command – Rock Island at Picatinny

Picatinny Arsenal, NJ 07806-5000

In Support of:

Project Manager Combat Ammunition Systems

Picatinny Arsenal, NJ 07806-5000

PPON Issue Date: August 19, 2026

Original Proposal Due Date: 1...

View on official source

Change History

Description ChangedNov 23, 2026 at 6:48 PM

Material change · Requirements + Scope + Attachment + Description

155mm Modular Artillery for Combat Effectiveness (MACE)

The visible text of the two versions looks nearly identical in the excerpt provided. The only differences appear in the attachment file name: the previous version is dated "Dated_11_16" and the updated version is "Dated_11_23__2_". The body text shown in both excerpts (dates, eligibility, Phase I/II scope, OTA authority, CPFF basis) matches. The excerpts are truncated at the end ("In addition, Offerors must..."), so any substantive edits later in the document cannot be confirmed from what was provided.

Applicants should compare the full attachments directly, particularly the eligibility and proposal-requirements sections after the truncation point, before relying on this as a complete account of the change.

Description ChangedNov 17, 2026 at 7:48 PM

Critical change · Deadline + Submission + Requirements + Attachment + Scope + Description

155mm Modular Artillery for Combat Effectiveness (MACE)

Only the attachment file name changed: the document went from "Dated_11_12" to "Dated_11_16." The PPON text itself, including the dates, eligibility conditions, phase descriptions, and acquisition approach, appears identical in both versions, so no substantive change to requirements, objectives, or restrictions was made.

Description ChangedNov 12, 2026 at 9:47 PM

Material change · Attachment + Submission + Requirements + Description

155mm Modular Artillery for Combat Effectiveness (MACE)

The only visible difference is cosmetic: the spacing in the "Revised Proposal Due Date" line was normalized, and the "In addition, Offerors must ..." sentence was reflowed. No requirement, date, eligibility condition, or technical scope was added, removed, or rewritten in the portion shown, so no substantive change was made to the description.

Description ChangedNov 9, 2026 at 4:46 PM

Critical change · Submission + Attachment + Requirements + Description

155mm Modular Artillery for Combat Effectiveness (MACE)

Most of the text is identical between versions. The only visible difference in the excerpt is formatting: the previous version had extra spaces and line breaks in several places (for example, the "U.S.Army" spacing carried over, but the eligibility bullets lost their bullet markers and some paragraph breaks were collapsed). The attachment filename changed from "Dated_10_29" to "Dated_11_5", indicating a newer document revision, but the substantive requirements, objectives, phase structure, eligibility conditions, and due dates shown in the excerpt are unchanged.

No substantive change to the scope or requirements is visible in the provided text; applicants should still review the full updated attachment, since the excerpt cuts off before the remaining eligibility and restriction language.

Date ChangedNov 4, 2026 at 1:53 PM

Critical change · Deadline

155mm Modular Artillery for Combat Effectiveness (MACE)

The close date moved from October 30, 2026 to November 30, 2026, a shift of 31 days later. Applicants now have roughly one additional month to prepare and submit their responses, which gives business-development teams more time to assemble proposals, secure partner commitments, and complete any required registrations. Teams that had already planned around the October deadline should update their internal timelines, but the extension removes pressure on the earlier schedule.

Description ChangedOct 30, 2026 at 4:48 PM

Material change · Attachment + Requirements + Description

155mm Modular Artillery for Combat Effectiveness (MACE)

The visible text of the description is identical between the previous and updated versions in the portion provided: the header, dates (Revised Proposal Due Date #2 of November 30, 2026), Section 1 background, acquisition approach, Phase I/II goals, eligibility conditions, and follow-on production language all match. The only difference appears in the attachment filename, which changed from "Dated_10_27" to "Dated_10_29," and this is not a scope or requirements change.

No substantive change was made to the description text; only the referenced attachment file name differs. Applicants should still open the new attachment to confirm whether any requirements in the portion beyond the truncated excerpt were revised.

Description ChangedOct 27, 2026 at 6:46 PM

Critical change · Deadline + Attachment + Description

155mm Modular Artillery for Combat Effectiveness (MACE)

  • Revised proposal due date moved again: the second amendment (dated October 27, 2026) extends the revised proposal deadline from October 30, 2026 to November 30, 2026, at 1500 EDT.
  • New amendment record added: the header now lists "PPON Amended Issue Date #2: October 27, 2026," and the attachment filename changed to reflect the October 27 version.
  • Core technical scope, objectives, and acquisition approach appear unchanged in the portion shown: the 30-35 km Phase I goal, the Phase II range-extension goal beyond 35 km, the CPFF OTA structure under 10 U.S.C. §4022, the up-to-two-award limit, and the eligibility conditions all remain the same.

Why it matters: applicants gain one additional month to finalize technical and pricing proposals, but should verify in the full attachment whether any other sections (beyond the portion shown) were modified, since the visible text only reflects the date and header changes.

Description ChangedOct 15, 2026 at 9:46 PM

Critical change · Deadline + Attachment + Scope + Requirements + Description

155mm Modular Artillery for Combat Effectiveness (MACE)

The two versions are nearly identical in the visible text. The only difference is the attachment filename, which changed from "Dated_10_6_" to "Dated_10_15_", indicating a later attachment revision. The visible body text (executive summary, acquisition approach, phase descriptions, eligibility conditions, and due dates of September 30 and October 30, 2026) reads the same in both versions, and the excerpts are truncated before any later sections where substantive edits might appear.

No substantive change to requirements, objectives, restrictions, or technical focus is evident in the provided text. Applicants should review the full October 15 attachment directly, since the excerpt cutoff may hide edits in later sections.

Description ChangedOct 6, 2026 at 6:39 PM

Informational change · Description

155mm Modular Artillery for Combat Effectiveness (MACE)

Description information changed.

Description ChangedOct 6, 2026 at 11:39 AM

Informational change · Description

155mm Modular Artillery for Combat Effectiveness (MACE)

Amendment 0004 added to the MACE (155mm Modular Artillery for Combat Effectiveness) description:

  • Q&A document replaced: Attachment 15 (Updated MACE Offeror Questions Addressed 9-17) is superseded by Attachment 16 (Updated MACE Offeror Questions Addressed 9-24). Offerors should re-read the newer version for any government clarifications issued between Sept 17 and Sept 24, and make sure proposals reflect them.
  • Six more TDP documents uploaded to SAM.gov: Vendors already approved for the Technical Data Package (TDP) can access them now. Vendors not yet approved must request TDP access through SAM. Anyone who needs the technical data should start the approval process early, since the documents and the Attachment 8 and 9 packages are gated behind the signed Attachments 12, 6 and 14.

Not changed: The description does not mention a new response deadline. The last stated deadline remains October 30, 2026 (from Amendment 0001). Amendments 0001–0003 and the rest of the text are unchanged.

Date ChangedOct 6, 2026 at 11:38 AM

Informational change · Unknown

155mm Modular Artillery for Combat Effectiveness (MACE)

The open date moved from September 18, 2026 to September 24, 2026, a delay of 6 days.

Why it matters for applicants:

  • The application window now begins 6 days later. If the close date was not changed (it isn't listed as changed), applicants have 6 fewer days in the window overall.
  • Applicants cannot submit before September 24. Any plans built around a September 18 start, such as early submission or system testing, need to be pushed back.
  • The extra lead time before opening can be used to prepare, but applicants should confirm the close date on the listing, since a fixed deadline now means a shorter submission period.

Action: Update internal timelines and calendars, and check that SAM.gov, Grants.gov, and any other registrations are active before the new open date.

Opportunity AddedSep 21, 2026 at 11:23 PM

155mm Modular Artillery for Combat Effectiveness (MACE)

New opportunity: 155mm Modular Artillery for Combat Effectiveness (MACE)

Similar Opportunities

Get Alerts for Opportunities Like This

RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.

Build Your Free Lane