This solicitation closed on November 2, 2026
View current Department of Defense opportunities →Next Generation Bomb Hoist
AI Overview
A Navy solicitation seeking a manufacturer for the Next Generation Bomb Hoist, a physical aircraft ordnance-handling system. The amendment answers vendor questions on past performance files, first article testing, and reference standards, and extends the proposal deadline.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
--- Attachment text --- [Solicitation_Amendment_N6833526R10120005_SF_30.pdf]
- CONTRACT ID CODE | PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT | J | 1 | 8
- AMENDMENT/MODIFICATION NUMBER | 3. EFFECTIVE DATE | 4. REQUISITION/PURCHASE REQUISITION NUMBER | 5. PROJECT NUMBER (If applicable) 0005 | 16 Nov 2026 | See Continuation Sheet
- ISSUED BY | CODE | N68335 | 7. ADMINISTERED BY (If other than Item 6) | CODE NAVAIR WARFARE CTR AIRCRAFT DIV LKE. JB MDL, BLDG 271 HIGHWAY 54...
Change History
Critical change · Deadline + Attachment + Description
Next Generation Bomb Hoist
- Proposal due date extended twice: Amendment 0005 moves the response deadline from 16 November 2026 to 19 November 2026, 4:00 PM EST (after Amendment 0004 had moved it from 2 November to 16 November).
- Past performance submission clarified: PP-1 must use the Form in Attachment 4 (Amendment 0001); Excel is not required, and file naming should use sequential "#" numbering. Offerors may duplicate the PP-1 information in Volume 2.
- First article testing scope settled: Testing applies to one production-equivalent PPU, not two. Salt fog testing applies only to that single first-article unit, not to the fourth PPU or to production units.
- Standards documents: Non-NAVAIR specifications (e.g., GEIA-STD-0007B, SAE AS5553) are not supplied by the government; industry should obtain them through Accuris.
Why it matters: Applicants must plan proposals around the later deadline, follow the prescribed past performance format, and budget test scope for one first-article unit with salt fog testing limited to that unit.
Critical change · Deadline + Requirements + Description
Next Generation Bomb Hoist
- Due date extended again: Proposal due date moved from 2 November 2026 (Amendment 0002) to 16 November 2026, 4:00 PM EST.
- Critical Safety Item sourcing relaxed: Offerors may propose Voto, or an alternate small business wire rope source, for cable assembly 4316AS0109-1, provided the source obtains an active DD Form 2345 and CMMC Level 2 (Self) before subcontract award and before any controlled technical data is transmitted. Drawing 4316AS0109 may be released to an alternate qualified source, subject to cable test, QA inspection, and past-performance review.
- No evaluation penalty for pending certification: A proposal that flags a non-certified drawing source and includes a resolution plan will not be assessed a weakness or deficiency under Section M.
- Test responsibilities clarified: For 4 production PPUs, the contractor performs all Production Acceptance tests in Table 1 of drawing 4316AS0101. For 1 first-article PPU, the contractor performs First Article tests in Table 1 and all Table 2 tests, with salt fog testing last. Salt fog is a first-article requirement only, not required on the two Government test units.
- First article report deadline changed: Clause 52.209-3(b) changed from 60 to 270 days (180 days production plus 90 days testing), up from the 60-day figure that had been in the solicitation.
Why it matters: Small businesses can now partner with a non-certified source and still compete, and pricing and schedules should reflect the longer first-article timeline and the expanded test scope.
Critical change · Deadline
Next Generation Bomb Hoist
The open date moved from September 17, 2026 to October 15, 2026, a delay of 28 days. Applicants get the opportunity to begin submitting about four weeks later than previously announced, so the window to prepare and submit is unchanged in length only if the close date also moved; if the close date stayed fixed, applicants now have roughly four weeks less time to prepare their responses. Businesses planning proposal writing, teaming arrangements, or budget work around the September start should shift those timelines to account for the October opening.
Critical change · Deadline
Next Generation Bomb Hoist
The close date moved later, from October 19, 2026 to November 2, 2026. That is a shift of 14 days (two weeks), so applicants gain two additional weeks to prepare and submit their responses. Teams that were planning around the October deadline should update internal schedules, though the new date does not change any eligibility or content requirements.
Material change · Eligibility + Requirements + Description
Next Generation Bomb Hoist
- Amendment 0003 added (dated 15 Oct 2026, replacing amendment 0002 dated 8 Oct 2026) with a new question on small-business set-aside: both the prime and the manufacturer must be small businesses, with no exceptions, citing deviated clauses FAR 52.219-33, 52.219-14, 52.219-8, and 52.219-6.
- Response due date unchanged at 2 November 2026, 4:00 PM EST, carried forward from amendment 0002.
- Carried-forward Q&A (amendments 0001 and 0002) repeat without new substance; the amendment 0001 pricing answer adds a step-ladder pricing structure for CLINs 0002-0006 (quantity tiers 1-25, 26-50, 51-75, 76-150, 150+).
Why it matters: applicants must confirm that both they and any manufacturing subcontractor qualify as small businesses, since partnering with a large manufacturer is not allowed. The text provided also shows the same DD Form 2345 and Level 2 cybersecurity requirement for all subcontractors, which applies to teaming plans.
Critical change · Deadline + Submission + Contact + Attachment + Description
Next Generation Bomb Hoist
- Proposal due date extended: Response deadline moved from 19 Oct 2026 to 2 Nov 2026, 4:00 PM EST. Amendment 0002 also specifies electronic submission through PIEE to Melanie Simon and Terrence Shearer.
- Page counts clarified: A question about Table G-1 confirmed there are no volume page limits.
- Amendment 0001 content carried forward: The amendment restates earlier answers, including updated SOW and CDRLs, new attachments (CAD/3-D model, PP-1 form, MPR 2100), and corrected drawing notes on anodize/engraving fill, the 4140 steel spec, and paint type.
- Paint spec changed: Notes 4B and 4C now require MIL-PRF-85285 Type I (not Type II) with updated red color #11136.
Why it matters: Applicants get roughly two additional weeks to prepare offers, and must submit electronically via PIEE. Pricing and cybersecurity requirements from earlier amendments (step-ladder pricing, Level 2 DD Form 2345 for both prime and manufacturing subcontractor) still apply.
Material change · Attachment + Description
Next Generation Bomb Hoist
A solicitation amendment attachment (N6833526R10120001.pdf) with contract form details and submission instructions has been added to the opportunity description.
Next Generation Bomb Hoist
New opportunity: Next Generation Bomb Hoist
Similar Opportunities
Get Alerts for Opportunities Like This
RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.
Build Your Free Lane