This solicitation closed on November 24, 2026
View current Department of Defense opportunities →Vertical Launching System (VLS) Launch Sequencer (LSEQ) Multiple Award Contract (MAC) Indefinite Delivery Indefinite Quantity (IDIQ)
AI Overview
A Navy amendment updating technical requirements for the Launch Sequencer (LSEQ) used in MK 41 Vertical Launching Systems, including its ethernet switches, power modules, and fiber optic cable assemblies. It is a multiple award IDIQ procurement covering fabrication, testing, and delivery of missile launch control hardware.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
--- Attachment text --- [N6339426R0005_Amendment_5.pdf]
- CONTRACT ID CODE | PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT | J | 1 | 40
- AMENDMENT/MODIFICATION NUMBER | 3. EFFECTIVE DATE | 4. REQUISITION/PURCHASE REQUISITION NUMBER | 5. PROJECT NUMBER (If applicable) 0005 | 16 Nov 2026 | See Continuation Sheet
- ISSUED BY | CODE | N63394 | 7. ADMINISTERED BY (If other than Item 6) | CODE COMMANDING OFFICER NAVAL SURFACE WARFARE CENTER PHD, 4363 MISSILE WAY PORT HUENEME, ...
Change History
Material change · Requirements + Description
Vertical Launching System (VLS) Launch Sequencer (LSEQ) Multiple Award Contract (MAC) Indefinite Delivery Indefinite Quantity (IDIQ)
- Response due date moved from 23 Oct 2026 to 23 Nov 2026 (in the earlier amendment), giving offerors an extra month.
- Section C statement of work revised: the earlier amendment removed "Refer to CDRLs" language from CLINs 0001-0008 and renumbered several CDRL references (A006 to A009, A009 to A010), and the later amendment (Amendment 5) updates the background and scope text, listing the LSEQ MK 6 Mod 1 (p/n 8652144-19) and its Lowest Replaceable Units for MK 41 VLS.
- Quality standard replaced: MIL-STD-1686C is swapped for ANSI/ESD S20.20 (Electrostatic Discharge Control Program) in SOW paragraphs 2.1 and 3.4.2.
- Testing terminology changed: "First Article Inspection" is replaced with "Factory Acceptance Testing" in Section L and Section M evaluation factors.
- Pricing instructions changed: Section B prices are no longer controlling; the JS-1 Stepladder attachment now governs in case of discrepancy, and Materiel CLIN 0015 is a fixed ceiling price in JS-1.
Why it matters: applicants have more time, must drop the FAI-based approach in favor of factory testing, and should price against the JS-1 attachment rather than Section B.
Critical change · Deadline
Vertical Launching System (VLS) Launch Sequencer (LSEQ) Multiple Award Contract (MAC) Indefinite Delivery Indefinite Quantity (IDIQ)
The open date moved from September 23, 2026 to October 23, 2026, a shift of 30 days later. Applicants get the same deadline window to prepare, but the start of submissions is delayed by a month, so teams planning to begin drafting or submitting in late September should re-align their schedules to the new October 23 opening. Since the change pushes the opening later rather than earlier, applicants do not gain additional time to respond to the solicitation overall unless the close date also moved, which this update does not indicate.
Critical change · Deadline
Vertical Launching System (VLS) Launch Sequencer (LSEQ) Multiple Award Contract (MAC) Indefinite Delivery Indefinite Quantity (IDIQ)
The close date moved from October 24, 2026 to November 24, 2026, a shift of 31 days later. Applicants gain one additional month to prepare and submit their responses, which may ease timing for proposal development, teaming arrangements, and internal review. Businesses that had planned around the October deadline should update their schedules, but the extended window also means competing applicants may take more time, so early engagement remains worthwhile.
Critical change · Submission + Requirements + Deadline + Attachment + Description
Vertical Launching System (VLS) Launch Sequencer (LSEQ) Multiple Award Contract (MAC) Indefinite Delivery Indefinite Quantity (IDIQ)
- Response due date moved from 23 Oct 2026 to 23 Nov 2026 (a one-month extension), and the amendment also answers questions received from offerors.
- CDRL references in the Statement of Work were renumbered: SOW 3.7.1 and 4.1 changed from CDRL A006 to A009; SOW 4.2.1 changed from CDRLs A006/A009 to A010, and its A008 reference changed to A009; SOW 3.7.3 now points to 4.2.1 instead of 3.14.3. Applicants should update any data-deliverable planning against the new CDRL numbers.
- CLIN 0001–0008 descriptions no longer direct offerors to the CDRLs for item and data requirements; the phrase "Refer to Contract Data Requirements Lists (CDRLs)" was removed.
- Pricing rules changed in Section L: the requirement that prices in Section B match Volume I was removed (paragraphs 2.3 and 2.4), and the new rule is that in any discrepancy, prices in the filled-out JS-1 Attachment control. Applicants should price in JS-1 and check consistency with that attachment.
- Table in SOW paragraph 8.1 was updated, though the amendment text does not show the specific table contents.
Why it matters: the extra month gives time to revise proposals, but offerors must re-check CDRL citations and make JS-1 the authoritative pricing source.
Vertical Launching System (VLS) Launch Sequencer (LSEQ) Multiple Award Contract (MAC) Indefinite Delivery Indefinite Quantity (IDIQ)
New opportunity: Vertical Launching System (VLS) Launch Sequencer (LSEQ) Multiple Award Contract (MAC) Indefinite Delivery Indefinite Quantity (IDIQ)
Similar Opportunities
Get Alerts for Opportunities Like This
RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.
Build Your Free Lane