RallyPropRallyProp.ai

This solicitation closed on November 10, 2026

View current Department of Defense opportunities →
N5005427Q0020ClosedINDUSTRY_EVENT

USS ARLINGTON (LPD-24) Expansion Joint Parts

Department of DefenseMID ATLANTIC REG MAINT CTR

AI Overview

Procurement of replacement exhaust expansion joints, bolts, nuts, washers, and gaskets for a ship's service diesel generator on USS Arlington, delivered to DLA Norfolk. Standard spare-parts supply for maintaining existing shipboard equipment.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
November 3, 2026
Due Date
November 10, 2026 (Closed)

Official Description

--- Attachment text --- [Attachment_I_Statement_of_Work_Rev1.pdf] 1 | P a g e

Statement of Work USS ARLINGTON LPD-24 SSP: TPPC-LPD24-MARMC28-CN01 Title: SHIP’S SERVICE DIESEL GENERATOR (SSDG) EXHAUST BELLOWS REPLACEMENT; ACCOMPLISH Work Spec Item: 324-15-001 1.0. INTRODUCTION

1.1. Background and Objective. This Statement of Work (SOW) defines the requirements for the supply and delivery of the parts listed in 2.1 be delivered to DLA Distribution Norfolk RMC PROJ, Bunker Hill Towaway Bldg. X13...

View on official source

Change History

Description ChangedNov 18, 2026 at 12:47 AM

Material change · Requirements + Attachment + Description

USS ARLINGTON (LPD-24) Expansion Joint Parts

  • Material list expanded and reorganized: The previous SOW listed five line items (2.1.1–2.1.5). The revision adds a sixth item (2.1.6) and inserts a new line for NUT, 1 1/4 inch-7UNC-2B, hex heavy stainless (ASTM A453 GR 660, ANSI B18.2.2), 24 EA, NSN 5310-01-294-4193. Requirements now cover 2.1.1–2.1.6.
  • Fastener count: Bolts remain at 24 EA, so each bolt now has a matching nut in the supply package.
  • Part-number labeling: The revision restructures the table so the NSN column is separate from the part-number column; the expansion joint and gasket entries are otherwise unchanged in specification.
  • Document identity: The SOW is retitled from "Attachment I Statement of Work" to "Rev1," and the title line changes "Spec Items" to "Work Spec Item," with no change to the work item number 324-15-001.
  • DD Form 2345 (Attachment II): Layout and form-field text were restructured, but no substantive change to certification requirements was made.

Why it matters: Applicants must now quote and source 24 nuts with the specified NSN, plus the additional line item 2.1.6 (a second 26-inch buttweld expansion joint). Pricing and sourcing for the fastener set and the added joint should be updated accordingly.

Status ChangedNov 10, 2026 at 11:47 PM

Informational change · Status

USS ARLINGTON (LPD-24) Expansion Joint Parts

The solicitation status changed from open to closed. Applicants can no longer submit proposals through the normal channel, so any work toward this opportunity should stop or shift to a different one. If you were still preparing a submission, check the notice for whether late or withdrawn applications are accepted and whether a pre-solicitation or cancellation notice explains the closure. Watch for a follow-on announcement, a reopening, or a new solicitation number, and set alerts on the agency's listing so you can pivot quickly if one appears.

Opportunity AddedNov 3, 2026 at 10:50 PM

USS ARLINGTON (LPD-24) Expansion Joint Parts

New opportunity: USS ARLINGTON (LPD-24) Expansion Joint Parts

Similar Opportunities

Get Alerts for Opportunities Like This

RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.

Build Your Free Lane