View current Department of Defense opportunities →Quick Acting Watertight Scuttle
AI Overview
Seeks a steel quick-acting watertight scuttle (21-inch diameter, three-dog closure) for USS Kearsarge, to be delivered to Norfolk, VA by June 2027. This is a supply of a single existing part built to a specified drawing, not a new technology development effort.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
--- Attachment text --- [Attached_I_Updated_Statement_of_Work.pdf] Statement of Work USS KEARSARGE Scuttle Quick Acting Watertight 1.0 INTRODUCTION:
1.1 Background and Objective. This Statement of Work (SOW) defines the requirements for the supply and delivery of the parts listed in 2.1 to SIMA Bldg. CEP200 C922, 9170 2nd Street Norfolk, VA 23511
2.0 GENERAL REQUIREMENTS/DELIVERABLES:
2.1 The Contractor shall supply and deliver the material listed in the table below complying wit...
Change History
Critical change · Deadline
Quick Acting Watertight Scuttle
The open date moved from October 1, 2026 to October 19, 2026, a delay of 18 days. Applicants get the opportunity to start work later, so they have 18 fewer days to prepare before submissions can begin. Teams planning around the original October 1 start should shift their proposal timelines, partner commitments, and internal reviews accordingly, though the 18-day shift does not by itself change the close date unless the solicitation states otherwise.
Critical change · Deadline
Quick Acting Watertight Scuttle
The close date moved later, from October 8, 2026 to October 26, 2026. That is an 18-day extension, so applicants gain more time to prepare and submit their responses. Business-development teams should update internal timelines and go/no-go planning to reflect the new deadline, though any preparatory work already scheduled around the earlier date can remain on track.
Critical change · Deadline + Scope + Requirements + Attachment + Submission + Description
Quick Acting Watertight Scuttle
- Required delivery date moved earlier: Section 2.2 changed from 10/19/27 to 06/30/27, about four months sooner. Applicants need to confirm they can deliver the scuttle by the new date.
- Drawing reference narrowed: The drawing citation changed from "167-6926167, Assembly Number 2, Detail 19-B" to "167-6926167 Revision E, Assembly Number 2, Detail 19-B." The item must now be built to Revision E of the drawing, so bidders should confirm they hold that revision.
No other substantive changes appear in the statement of work. The DD Form 2345 attachment text is unchanged in the portions shown.
Informational change · Status
Quick Acting Watertight Scuttle
The opportunity's status changed from open to closed. Applicants can no longer submit proposals through this solicitation, so any work on an application for it should stop. Businesses that had planned to apply should check whether a successor opportunity or a re-competition has been announced, and should watch for any notice of a reopening or a new solicitation number. Existing drafts can be kept for a future opportunity with similar scope, but they cannot be submitted to this one.
Quick Acting Watertight Scuttle
New opportunity: Quick Acting Watertight Scuttle