N4008526R0138ClosedCONTRACT

DESIGN-BID-BUILD (DBB) SOF MARINE RAIDER FACILITIES COMPLEX, MARINE CORPS BASE (MCB) CAMP LEJEUNE, NORTH CAROLINA

Department of DefenseN40085 NAVFACSYSCOM MIDLANT

AI Overview

Seeks a design-bid-build contractor to construct SOF Marine Raider battalion, company, and team facilities at MCB Camp Lejeune, NC. This is standard construction procurement, with an amendment updating temporary environmental control requirements.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
October 1, 2026
Due Date
October 27, 2026 (Closed)

Official Description

--- Attachment text --- [AMENDMENT_0014___N4008526R0138.pdf] R 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment...

View on official source

Change History

Description ChangedOct 29, 2026 at 3:46 PM

Material change · Attachment + Requirements + Description

DESIGN-BID-BUILD (DBB) SOF MARINE RAIDER FACILITIES COMPLEX, MARINE CORPS BASE (MCB) CAMP LEJEUNE, NORTH CAROLINA

  • Amendment number advanced from 0013 to 0014 (issued 29 Oct 2026), superseding the prior enclosures. The 0014 package states its enclosures replace those provided in Amendment 0013.
  • Section 01 57 19 (Temporary Environmental Controls) is the substantive scope change. Part 1.5.1.2 for Camp Lejeune was revised to align with MCB Camp Lejeune Environmental Standard Operating Procedure ESOP 5090.10.1 (January 21, 2026). Applicants must price and plan temporary environmental controls (dust, erosion, stormwater, and related measures) to that local SOP rather than the earlier baseline.
  • Attachment reissued, not materially reworded in the excerpt shown. The 01 57 19 PDF and .sec files were re-released, so bidders should use the current versions when preparing environmental control costs.
  • Why it matters: Environmental control requirements directly affect site-work and general conditions pricing, and the proposal response date remains 30 October 2026 at 1400. Teams should confirm their estimates reflect ESOP 5090.10.1 compliance before submitting.
Description ChangedOct 28, 2026 at 9:45 PM

Critical change · Deadline + Attachment + Requirements + Description

DESIGN-BID-BUILD (DBB) SOF MARINE RAIDER FACILITIES COMPLEX, MARINE CORPS BASE (MCB) CAMP LEJEUNE, NORTH CAROLINA

  • Amendment 0013 replaces the prior attachment, adding a substantive scope change to Section 01 57 19 (Temporary Environmental Controls): Part 1.5.1.2 is revised to align with the Camp Lejeune Environmental Standard Operating Procedure ESOP 5090.10.1 (dated January 21, 2026).
  • Supporting documents were added: a revised price proposal form ("P-1550 PRICE SCHEDULE_NAVFAC REVISIONS 20261027_V3") and a set of PPI responses ("PPI Responses 6"), which bidders should review because they may change how pricing is submitted.
  • Response date is unchanged at 30 October 2026, NLT 1400. The prior version's text described an extension to that date, but this amendment states it remains the same.

Why it matters: Applicants must price the environmental controls work under the Camp Lejeune SOP requirements, not the earlier baseline, and must use the revised price schedule. Bids built on the old pricing form or environmental assumptions risk being non-responsive.

Description ChangedOct 26, 2026 at 8:45 PM

Critical change · Deadline + Attachment + Description

DESIGN-BID-BUILD (DBB) SOF MARINE RAIDER FACILITIES COMPLEX, MARINE CORPS BASE (MCB) CAMP LEJEUNE, NORTH CAROLINA

  • The proposal response deadline moved from 20 Oct 2026 to 27 Oct 2026 in Amendment 0011, then from 27 Oct 2026 to 30 Oct 2026 in Amendment 0012, both at 1400 local time.
  • The amendments changed only the due date. The scope of the project is unchanged: the 73,400 SF operations, supply, communications and intel facility, the 127,200 SF company HQ and team facilities, the 17,600 SF storage buildings, and the site work at Stone Bay, Marine Corps Base Camp Lejeune, remain as described.
  • Amendment 0012 also updated the project title to add "MARINE CORPS BASE (MCB) CAMP LEJEUNE, NC" and noted the contracting officer's signature, but these are administrative, not requirement changes.

Why it matters: applicants have three extra days to finalize and submit offers. Teams should plan against the 30 Oct 2026 deadline, and any previously submitted offer can still be revised by letter or electronic communication received before the opening time. Confirm that your acknowledgment of Amendment 0012 is included with your submission, since failure to acknowledge amendments can lead to rejection.

Date ChangedOct 24, 2026 at 3:47 PM

Critical change · Deadline

DESIGN-BID-BUILD (DBB) SOF MARINE RAIDER FACILITIES COMPLEX, MARINE CORPS BASE (MCB) CAMP LEJEUNE, NORTH CAROLINA

The open date moved from October 1, 2026 to October 20, 2026, a shift of 19 days later. Applicants gain 19 more days before the opportunity opens, so the start of the application window is delayed. For business-development teams, this means earlier preparation work (eligibility checks, teaming, budget drafting) still applies, but the actual submission window will not begin until later in October. Teams planning around the original October 1 date should update their calendars and any internal milestones tied to the opening.

Date ChangedOct 24, 2026 at 3:47 PM

Critical change · Deadline

DESIGN-BID-BUILD (DBB) SOF MARINE RAIDER FACILITIES COMPLEX, MARINE CORPS BASE (MCB) CAMP LEJEUNE, NORTH CAROLINA

The application close date moved later, from October 15, 2026 to October 27, 2026. That is a 12-day extension, so applicants have 12 more days to submit their responses.

For business-development teams, this means more time to finalize proposals, teaming arrangements, and required documentation. Planning should be updated to the new October 27 deadline, though internal targets may still be worth keeping near the original date to avoid last-minute submission risk.

Description ChangedOct 20, 2026 at 5:48 PM

Critical change · Deadline + Attachment + Description

DESIGN-BID-BUILD (DBB) SOF MARINE RAIDER FACILITIES COMPLEX, MARINE CORPS BASE (MCB) CAMP LEJEUNE, NORTH CAROLINA

  • Amendment 0011 extends the proposal due date from 20 October 2026 to 27 October 2026 (NLT 1400). This is the only substantive change in the description.
  • Amendment 0010 (the prior version) carried the PPI response set, including clarifications on cementitious board and moisture-resistant gypsum board in restrooms and showers, A/V cabling responsibility (prime contractor), and the split between GFGI security devices and CFCI infrastructure/power. The new version's attachment text does not repeat those clarifications, so applicants should rely on the prior PPI responses for scope interpretation unless the contracting office reissues them.
  • Title wording dropped "Company & Team Facilities" to "Company & Team Facilities" with the MCB Camp Lejeune reference removed from the header, but the project scope is unchanged.

Why it matters: applicants get one extra week to submit proposals, and offerors who planned around the 20 October deadline should update their schedules. Amendment 0011 also has no scope changes, so bid pricing based on the PPI responses still applies.

Description ChangedOct 15, 2026 at 8:45 PM

Critical change · Deadline + Attachment + Description

DESIGN-BID-BUILD (DBB) SOF MARINE RAIDER FACILITIES COMPLEX, MARINE CORPS BASE (MCB) CAMP LEJEUNE, NORTH CAROLINA

  • Amendment 0010 adds Q&A responses (PPI set 5) to the description. The prior version had only the proposal due-date extension (15 Oct 2026 to 20 Oct 2026 NLT 1400) and the project scope summary. The new version includes an attached table of pre-proposal questions and government responses, covering topics such as:
    • Restroom wall tile vs. moisture-resistant gypsum board and cementitious board at showers (response: cementitious board required at all showers; tile per interior drawings, otherwise moisture-resistant gypsum board).
    • Audio/visual cabling and conduit responsibility (response: prime contractor provides A/V cabling and conduit).
    • Scope split for security systems and A/V: security cabling and devices are government-furnished (GFGI); infrastructure and power are contractor-furnished (CFCI) and in the base bid; scheduled A/V equipment and labor fall under the A/V plan modification option.
  • Why it matters: Bidders must price the base bid to include CFCI infrastructure, power, and conduit, and exclude GFGI security devices. The A/V equipment and labor are priced separately as an option, which affects bid comparison and cost estimates.
  • Due date: Unchanged in this version at 20 Oct 2026 NLT 1400.
Description ChangedOct 14, 2026 at 5:38 PM

Critical change · Deadline + Attachment + Description

DESIGN-BID-BUILD (DBB) SOF MARINE RAIDER FACILITIES COMPLEX, MARINE CORPS BASE (MCB) CAMP LEJEUNE, NORTH CAROLINA

  • Amendment 0009 supersedes 0008 on the proposal deadline: the revised proposal due date moves from 15 October 2026 (NLT 1400) to 20 October 2026 (NLT 1400). Amendment 0008 had previously moved it from 02 September 2026 to 15 October 2026.
  • Purpose stated as deadline extension only: Amendment 0009 says its sole purpose is to extend the submission deadline. Amendment 0008's discussion questions, revised drawings and specifications (REV 4), updated wage determination, and PPI responses are not repeated in this version.
  • Project title trimmed: the title drops the trailing "MARINE CORPS BASE (MCB) CAMP LEJEUNE, NC" reference in the header, though the scope description (6,815 SM operations facility, 11,812 SM company HQ, 1,635 SM storage, pile foundations, wetlands mitigation) is unchanged.

Why it matters: applicants have five additional days to submit offers, and any offer change or acknowledgment of Amendment 0009 must be received by 20 October 2026 at 1400. Teams should confirm they have acknowledged both Amendment 0008 and 0009 and are working from the REV 4 drawings and specifications.

Opportunity AddedOct 2, 2026 at 3:42 PM

DESIGN-BID-BUILD (DBB) SOF MARINE RAIDER FACILITIES COMPLEX, MARINE CORPS BASE (MCB) CAMP LEJEUNE, NORTH CAROLINA

New opportunity: DESIGN-BID-BUILD (DBB) SOF MARINE RAIDER FACILITIES COMPLEX, MARINE CORPS BASE (MCB) CAMP LEJEUNE, NORTH CAROLINA