N3220526R6128ActiveCONTRACT

USNS POINT LOMA (T-EPF 15) Mid-Term Availability

Department of DefenseMSC WAREHOUSE

AI Overview

Mid-term maintenance and repair availability for USNS POINT LOMA (T-EPF 15) naval vessel, including aluminum welding, watertight closure repairs, sewage system overhaul, and plate cooler maintenance per detailed work specifications.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
September 15, 2026
Due Date
October 20, 2026

Official Description

--- Attachment text --- [RFC_038___Answered.docx] REQUEST FOR SPECIFICATION CLARIFICATION #038

Work Item: 513

Paragraph/Section: 7.0

Title: Sewage/ Macerator Pump Overhaul

Question:

OEM states that the work item is not applicable to any of the hulls after #12, and only 524A is required. Please advise on how to proceed.

Answer:

KTR shall bid the scope of work as written. OEM can advise on site if work is to be de-scoped

[RFC_039_043___Answered.docx] REQUEST FOR SPECIFICATION CLARIFICATIO...

View on official source

Change History

Description ChangedOct 4, 2026 at 3:38 PM

Informational change · Description

USNS POINT LOMA (T-EPF 15) Mid-Term Availability

Key Changes to N3220526R6128 Amendment 0002

The description now includes 16 additional Requests for Clarification (RFCs 038-052) addressing specific work scope questions:

Major Clarifications:

  • WI 513 (Sewage/Macerator Pump): Contractors must bid scope as written; OEM exceptions handled on-site
  • WI 120 (Aluminum Repairs): Clarified furnished plate quantities (4 sheets of 6mm 5083, 8 sheets of 8mm 5083, 4 sheets of 6mm 6061); crack repairs may involve dissimilar aluminum grades (5xxx/6xxx/5454) with varying thicknesses
  • WI 160 (Watertight Closures): Reference drawing shows 76 openings (not 69); overlaps with WI 1003
  • WI 201 (Plate Cooler): SmartPAC coolers must be cleaned; in-place fittings allow optional disassembly per Port Engineer discretion
  • WI 173A (Preserve and Paint Topside): Use version dated 2026-09-12 from MSC contracting
  • Cast Aluminum/Duplex Steel: No projected repairs; changes via future contract modification if needed
  • Staging Requirements: Minimal 4-meter staging needed; refer to HSSD document for specific locations

Impact: Contractors must bid full scope uncertainty on material grades, thicknesses, and inspection-dependent staging rather than exact specifications.

Description ChangedSep 24, 2026 at 5:46 PM

Informational change · Description

USNS POINT LOMA (T-EPF 15) Mid-Term Availability

Description information changed.

Description ChangedSep 22, 2026 at 6:04 PM

Material change · Requirements + Scope + Description

USNS POINT LOMA (T-EPF 15) Mid-Term Availability

Multiple Request for Clarification responses added critical technical specifications, work item clarifications, and contract details (AGR/ODC costs, shore power duration, equipment serials, work item scope) that materially affect bidding and performance requirements.

Opportunity AddedSep 21, 2026 at 11:23 PM

USNS POINT LOMA (T-EPF 15) Mid-Term Availability

New opportunity: USNS POINT LOMA (T-EPF 15) Mid-Term Availability