View current Department of Defense opportunities →ex-CGN9 Long Beach Dismantlement and Disposal
AI Overview
This Navy opportunity seeks a contractor to dismantle and dispose of the decommissioned USS Long Beach, including handling radioactive waste, transport, and recycling of salvageable materials. It addresses the safe removal and disposition of a retired nuclear-powered vessel.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
--- Attachment text --- [L_1_Bidders_Question_Submittal_and_Answer_11_6_26.pdf] Question Number: Question Source: (RFP, Attachment #, etc.) Page Number and Paragraph Header from Source: Question: Answer: SOW 4.2.5.2; 4.2.6.1 - 4.2.6.3 Waste Ownership: While not a co-generator or co-permittee, please confirm that the Government will continue to have ownership of all LLRW “expected to be generated during the dismantlement of the ex-Long Beach” for which the Contractor will take possession and beco...
Change History
Material change · Requirements + Scope + Description
ex-CGN9 Long Beach Dismantlement and Disposal
- Q&A attachment replaced with a newer round (11/6/26 vs. 11/2/26). The prior version carried Q&A on past performance, the NRC work-experience threshold, bonding, and small-business goals. The updated version drops those items and centers on waste ownership and custody.
- Waste ownership clarified: Naval Reactors retains authority over program radioactive material until transfer to an authorized disposal facility, while the dismantlement contractor takes custody and safe-management responsibility once in possession.
- Easement role clarified: the Navy will use the 375,000 cu yd easement only if the contractor does not complete disposal, and the Navy is the disposing party of record in that case.
- Title and risk: the Navy keeps title to the vessel; custody and radioactive material transfer to the contractor under RFP terms, and removed material becomes the contractor's responsibility.
- Custody handoff: occurs at a mutually agreed location near PSNS, with the Navy responsible before handoff.
- Recyclable material ownership is deferred to an earlier answer (Q104).
- Past-performance questionnaire adds a November 23, 2026 return deadline to the Navy's contact and bars offerors from handling completed forms.
For applicants, this means contractors must plan for taking custody, managing LLRW and hazardous waste, and carrying disposal liability, with the Navy as backstop via the easement.
Critical change · Deadline + Eligibility + Requirements + Submission + Attachment + Description
ex-CGN9 Long Beach Dismantlement and Disposal
- Q&A round replaced entirely: The earlier attachment (Bidder's Questions dated 10/23/26, Q7–Q26) was swapped for a later set (dated 11/2/26, Q57–Q95) with follow-up responses.
- Past performance (Section L.3.E): Offerors must still provide three recent, relevant contracts within five years. One major subcontractor's past performance may be included, at the offeror's choice, and the Navy declined to amend the wording.
- NRC experience ($220M, past five years): Prime and subcontractor/teaming experience may count toward the threshold. Examples of qualifying work are tied to Section M relevance categories (LLRW removal, site termination, vessel and facility dismantlement). Follow-up says this does not limit qualifying experience beyond Section M.
- Performance bond: A 20% bond must be in place before the contractor takes possession of the vessel and kept until completion. An alternative 30% bond applies if no 375,000 cubic yard LLRW disposal easement is in place, with the same timing.
- Small business goals: Subcontracting goals are measured against total planned subcontracting dollars. The 5% small disadvantaged business goal is mandatory, and offerors must notify the Navy if 20% small business is not achievable.
- Performance-based payments: May be tied to mobilization, transport, dismantlement milestones, and disposal completion, plus the 15% final site release.
- Drone protection and security: Offerors must address counter-drone measures, with a Temporary Flight Restriction deemed sufficient. Protected areas include the propulsion plants within the vessel.
Critical change · Deadline
ex-CGN9 Long Beach Dismantlement and Disposal
The open date moved from September 30, 2026 to October 24, 2026, a shift of 24 days later. Applicants gain more time before the opportunity opens, so anyone planning to begin proposal preparation, partner outreach, or registration on the original schedule should push those milestones back accordingly. Because the open date is later, the window for submission will also start later, which may affect internal review timelines and resource planning for business-development teams tracking this funding.
Critical change · Deadline
ex-CGN9 Long Beach Dismantlement and Disposal
The close date moved from October 30, 2026 to November 13, 2026, a shift of 14 days later. Applicants gain two extra weeks to prepare and submit their proposals. Teams that had planned around the original deadline can now allocate more time to proposal writing, budget finalization, and compliance review, though they should not assume further extensions and should plan submissions to finish before the new date.
Critical change · Deadline + Submission + Attachment + Description
ex-CGN9 Long Beach Dismantlement and Disposal
- The attachment changed from an SF 30 amendment (Amendment 0001 correcting the response due date from 30 Oct 2026 to 06 Nov 2026, and adding/deleting FAR 52.228-16 performance and payment bond requirements) to a bidder's question-and-answer submittal (Attachment L-1) dated 10/23/26.
- Key clarifications now in the document:
- Q8/Q15: Requests to extend the proposal due date were addressed by pointing to Amendment 0002, which extends the due date to 11/13/26.
- Q7: The Navy will consider NEPA analysis of the Port of Everett; offerors should propose viable disposal locations.
- Q10: No Davis-Bacon or Service Contract Act wage rates apply.
- Q16/Q17: The Attachment J-8 subcontracting plan is a placeholder to be supplied by offerors in Vol III if applicable; Sections L and M attachments need not be included in proposals.
- Q18: Section L 3.1.5 is corrected to refer to dismantlement (not disposal) operations notification, per Amendment 0002.
- Q19: CMMC unique identifiers go in Volume II.
- Q21–24: The Navy declined to add price realism analysis, comparative qualitative Factor 1 evaluation, or changes to resource-adequacy standards; price will be evaluated for reasonableness and Section M stays as written.
- Why it matters: Applicants should not expect Section M to change, should use Amendment 0002's 11/13/26 date, and should place CMMC UIDs in Volume II and any subcontracting plan in Volume III.
Informational change · Description
ex-CGN9 Long Beach Dismantlement and Disposal
Description information changed.
ex-CGN9 Long Beach Dismantlement and Disposal
New opportunity: ex-CGN9 Long Beach Dismantlement and Disposal
Similar Opportunities
ENVIRONMENTAL WASTE REMOVAL FROM DREDGE WHEELER BPA
Due November 30, 2026
ActiveMulti Mission Surface Combatants Post Delivery Execution Yard
Due January 11, 2027
ActiveSWFLANT Support, Near Port Security Barrier Operations and Waterfront Restricted Area Gate Openings and Closings, Naval Submarine Base Kings Bay, Georgia
Due December 29, 2026
Get Alerts for Opportunities Like This
RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.
Build Your Free Lane