N0002426R2232ClosedCONTRACT

RFP for Multi-Mission AUTEC Range Vessel (MARV) Under N00024-26-R-2232

Department of DefenseNAVAL SEA SYSTEMS COMMAND

AI Overview

The Navy is seeking a contractor to build a Multi-Mission AUTEC Range Vessel (MARV) to support undersea testing and training range operations. This amendment extends the proposal due date to 02 November 2026 and updates solicitation documents.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
September 8, 2026
Due Date
October 26, 2026 (Closed)

Official Description

--- Attachment text --- [Solicitation_Amendment_N0002426R22320005_SF_30.pdf] R 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies ...

View on official source

Change History

Description ChangedOct 26, 2026 at 1:46 PM

Critical change · Deadline + Requirements + Attachment + Description

RFP for Multi-Mission AUTEC Range Vessel (MARV) Under N00024-26-R-2232

  • Proposal due date extended twice: From 12 Oct 2026 (Amendment 0002) to 26 Oct 2026, then to 02 Nov 2026 (Amendment 0005), with the due time moving from 05:00 PM to 04:00 PM on the final date. Applicants should plan around 02 Nov 2026 at 4:00 PM.
  • Clause C-211-H003 removed: The dry-docking facilities and shipbuilding ways certification requirement (MIL-STD-1625D, certification report due 12 months before first launch) was deleted from Section C in Amendment 0002.
  • FAR 52.249-8 added: The Default (Fixed-Price Supply and Service) clause was incorporated into Section I, so contractor default termination terms now apply.
  • Attachments and Section L/M updated: Amendment 0002 added a distribution-A DRL attachment (J-2) for proposal use, revised Attachments J-1 and L-10, and updated Sections L and M, including past performance requirements. Amendment 0005 revised Attachment L-11 (Section L paragraph L.1) and the bidders' questions form (L-1).

Why it matters: the shipbuilding-facility certification removal and the default clause change affect eligibility assessment and risk pricing, and the revised Sections L/M and past performance rules should be checked against your proposal package before the new deadline.

Date ChangedOct 24, 2026 at 3:46 PM

Critical change · Deadline

RFP for Multi-Mission AUTEC Range Vessel (MARV) Under N00024-26-R-2232

The open date moved from September 8, 2026 to October 6, 2026, a delay of 28 days (four weeks). Applicants now have four weeks later to begin preparing and submitting, so the window for early drafting and pre-submission questions opens later. Because the close date is not listed as changed, the total application window may be shorter if the closing date stayed fixed; applicants should confirm the close date in the current version and plan submissions accordingly.

Date ChangedOct 24, 2026 at 3:46 PM

Critical change · Deadline

RFP for Multi-Mission AUTEC Range Vessel (MARV) Under N00024-26-R-2232

The close date moved from October 12, 2026 to October 26, 2026, a shift of 14 days later. Applicants have two more weeks to submit their responses. This gives business-development teams more time to finalize proposals, gather supporting documents, and coordinate partner input, but the later deadline does not change any other eligibility or submission requirements.

Description ChangedOct 6, 2026 at 5:39 PM

Informational change · Description

RFP for Multi-Mission AUTEC Range Vessel (MARV) Under N00024-26-R-2232

Amendment 0004 to NAVSEA solicitation N00024-26-R-2232 replaces Amendment 0003 in the description. It makes these changes:

  • Deadline: Proposals are now due 26 Oct 2026, moved from 12 Oct 2026.
  • Dry-docking clause removed: C-211-H003 is deleted. It required dry-docking facilities and shipbuilding ways to be certified under MIL-STD-1625D, with the Facility Certification Report due to NAVSEA Code 04 at least 12 months before the first launch.
  • Default clause added: FAR 52.249-8, Default (Fixed-Price Supply and Service) (Apr 1984), is incorporated in Section I.
  • Proposal instructions revised: Section L (paragraph L.1) and the Section M Past Performance criteria are updated. The text of those changes is not in the excerpt, so read Addendum L-11 (Sections L and M_0003).
  • Attachments updated:
    • J-1 Specification is now version 0003.
    • L-10 MARV Requirements Matrix is updated.
    • A new J-2 DRLs version marked Distro A is added, for proposal purposes only.

Why it matters: Offerors get two more weeks. They should recheck the evaluation criteria and the past-performance submission, and review the updated specification and MARV matrix for compliance. Removing the dry-dock certification lowers a facility burden. The default clause adds termination-for-default expos

Description ChangedSep 22, 2026 at 5:57 PM

Informational change · Description

RFP for Multi-Mission AUTEC Range Vessel (MARV) Under N00024-26-R-2232

Description information changed.

Opportunity AddedSep 21, 2026 at 11:22 PM

RFP for Multi-Mission AUTEC Range Vessel (MARV) Under N00024-26-R-2232

New opportunity: RFP for Multi-Mission AUTEC Range Vessel (MARV) Under N00024-26-R-2232

Similar Opportunities

Get Alerts for Opportunities Like This

RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.

Build Your Free Lane