This solicitation closed on October 23, 2026
View current Department of Defense opportunities →HQ USMC Phase 2 Relocatables Progressive Design Build OTA
AI Overview
Design and build secure, pre-fabricated steel relocatable facilities meeting intelligence community standards across ten Marine Corps and DoD installations. This OTA covers site adaptation, facility fabrication, delivery, installation, utilities integration, and security infrastructure to support operational needs.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
--- Attachment text --- [SOW_FYXX_USMC_RELOCATABLE_Draft_Mrkt.docx] SECTION 01 11 00.10
STATEMENT OF WORK
CONTRACT NO. W912DY27C00xx
FY27 USMC Relocatable Effort
20 August 2026
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. When used, a code following the "G" classification identifies the office that will review the submittal for...
Change History
Informational change · Status
HQ USMC Phase 2 Relocatables Progressive Design Build OTA
The solicitation status changed from open to closed. Applicants can no longer submit proposals or applications through the posted channel, so any work still in progress for this opportunity should stop being framed as a live bid. If you had a submission drafted, check whether the agency accepted it before the closing point or whether it now needs to be withdrawn from your pipeline. Watch the agency's notices for any reopening, amendment, or follow-on announcement, and redirect preparation effort toward other open opportunities or the next cycle of this program.
HQ USMC Phase 2 Relocatables Progressive Design Build OTA
New opportunity: HQ USMC Phase 2 Relocatables Progressive Design Build OTA
Similar Opportunities
Sources Sought Renovate Mission Support Facility (B145) and Repair/Renovate Conference Room (LRSO), Alert Facility (B1085) Minot Air Force Base (MAFB), North Dakota
Due December 11, 2026
ActiveENGINEERING - TESTING - ANALYSES - AND - SPECIALIZED - SERVICES
Due November 24, 2026
ActiveDemolition of an existing building, Site Improvements and construction of a Modular Office Building at the US Merchant Marine Academy Campus, Kings Point, NY
Due December 7, 2026
Get Alerts for Opportunities Like This
RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.
Build Your Free Lane