Shallow Jet Spurt Engineering Model
AI Overview
This RFP seeks development of a computationally efficient engineering model to predict fluid jet formation from shaped-charge liners. The reduced-order model will enable faster warhead design iteration by accurately forecasting spurt characteristics while avoiding expensive hydrocode simulations.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
This topic seeks the development of a computationally efficient engineering-level model to predict the formation and characteristics of the "spurt" in fluid cavity created jets. The hydrodynamic spurt is the initial, often unsteady, ejection of material from the liner, preceding the formation of the main, stable jet. Current hydrocodes can model this phenomenon but are computationally expensive and ill-suited for rapid design iteration. This project will develop a validated, reduced-order model ...
Change History
Material change · Requirements + Eligibility + Submission + Description
Shallow Jet Spurt Engineering Model
- Q1 (new): CMMC/DD 2345 timing. Answers say CMMC Level 2 (Self) must be in SPRS before award (may follow selection notice) and an active DD 2345 is required before award. Whether a set post-selection deadline exists, and how award is timed if the DD 2345 is still under Joint Certification Program review, will be determined at award.
- Q2 (new): Showcase/follow-on evidence. Performers must provide operational evidence for follow-on funding decisions. For Phase I, this is included in the technical report.
- Q3 (previously Q1, answer unchanged): Phase I test data. Spurt timing is the key comparison metric, followed by volume and direction. Data is gathered from high-speed imagery and pressure transducers, delivered shortly after award, and treated as CUI.
- Q4 (previously Q2, unchanged): Data rights. No specific restrictions.
- Q5 (previously Q3): CMMC. Answer "Yes" (facilitates data review); no new detail.
- Q6 and Q7: Export control. Both state no ITAR restrictions; Q7 is a duplicate of Q6.
- Q8 (previously Q6): Spurt definition. Confirms the focus is external fuel spurt from ballistic penetration of the fluid-filled tank, before main cavity collapse.
- Q9 (previously Q7): Shaped-charge, hydrocode, and Phase II testing. Typical parameters are fragment or API impact on an aluminum fuel tank wall. Hydrocode will not be provided; Phase I comparisons are against Government test data; Government can complete the testing.
Why it matters: Applicants now know CMMC and DD 2345 must be in place before award, with timing negotiable, and that Phase I reports must include operational evidence. Phase I scope is clearer: match spurt timing against CUI test data with no Government hydrocode.
Informational change · Description
Shallow Jet Spurt Engineering Model
- Q1 answered: Phase I comparison focus is spurt timing first, then volume and direction. Metrics come from high-speed data and pressure transducers.
- Test data timing: delivered shortly after award, and will be treated as CUI (previously no marking stated).
- Q1 sub-question on number of shots and configurations is addressed only generally: several shotlines exist, and the focus for Phase I can be discussed with the Government.
Material change · Requirements + Description + Attachment
Shallow Jet Spurt Engineering Model
- New Q1 added on Phase I comparisons: asks whether spurt velocity, ejected mass, and spatial geometry must be quantitatively compared to Phase I test data, or whether a model framework and feasibility assessment can be used with quantitative comparison deferred to Phase II. It also asks how many shots and configurations, which spurt quantities are measured, when data is delivered after award, and whether it will be marked CUI or carry distribution limits. No answer yet.
- Q2 through Q6 renumbered (previously Q1 through Q5); content unchanged, except the duplicate export-control question remains (now Q4 and Q5), both still answered "No ITAR restrictions."
- Q7 (formerly Q6) on baseline shaped-charge configuration, hydrocode reference data, and Phase II testing: answer unchanged. Key points: hydrocode will not be provided, Phase I comparisons are against Government test data, and Government can complete the testing.
Why it matters: The new question shows applicants are seeking to know whether Phase I can be scoped as a model framework with quantitative test comparison deferred, and what Government test data will look like (shot count, measured quantities, delivery timing, CUI marking). The Government has not yet answered, so the scope and data-handling terms remain open and should be watched in later amendments.
Informational change · Description
Shallow Jet Spurt Engineering Model
- Q1 (data rights): Answered: no specific data right restrictions apply to Phase I deliverables.
- Q2 (CMMC): Answered "Yes," stating CMMC Level 2 certification is needed to facilitate data review. The answer does not say when it applies at award, so the timing is still unclear.
- Q3 and Q4 (export control, duplicated question): Both answered "No ITAR restrictions." Neither answer addresses EAR or a classification, so the EAR question remains open.
- Q5 (spurt terminology): Answered that the focus is the external fuel spurt from ballistic penetration of the fluid-filled tank, occurring before main cavity collapse. Internal cavity jetting is noted as a later investigation item.
- Q6 (baseline configuration, hydrocode, Phase II testing): Answered that test parameters center on API or fragment impact on an aluminum fuel tank wall, with any simplified proposed cases allowed. No hydrocode will be provided; comparisons will be against Phase I test data. Government will complete the testing, so performers need not plan independent physical testing.
Why it matters: Applicants can now plan around the external spurt focus, no ITAR limits, and no hydrocode delivery. They should still confirm CMMC timing and EAR status before bidding.
Material change · Requirements + Eligibility + Description
Shallow Jet Spurt Engineering Model
- Q1 (data rights) added: New question asking what data rights apply to Phase I deliverables and whether specific assertion requirements exist. No answer is shown yet.
- Q2 (CMMC) added: New question asking whether CMMC Level 2 certification is required at award or only a self-assessment, and when it applies. No answer shown yet.
- Q3 and Q4 (export control) added: Two identical questions asking whether topic DAF27BZ01-NV001 is subject to ITAR or EAR and what classification applies. Neither has an answer shown.
- Prior Q1 and Q2 renumbered to Q5 and Q6: The terminology question on hydrodynamic spurt versus shaped-charge jetting, and the baseline configuration/hydrocode/Phase II testing question, are carried over unchanged, including the existing answer.
Why it matters: Applicants should plan for possible ITAR/EAR restrictions on the hardware, a CMMC Level 2 certification requirement, and data rights assertions, none of which are answered yet. The one existing answer confirms the Government will not provide hydrocode, that comparisons will use Phase I test data, and that the Government can perform the testing.
Informational change · Description
Shallow Jet Spurt Engineering Model
- New Q&A added (Q1): A new question asks whether the primary study topic is the hydrodynamic spurt from fuel ejection after ballistic penetration of fluid-filled fuel tanks, or the internal jet formation from shaped-charge liner collapse. The question seeks terminology clarification to guide solution approach.
- Q2 re-numbered: The original baseline shaped-charge, Phase I hydrocode data, and Phase II experimental validation questions moved from Q1 to Q2, with their existing answer (A2) unchanged.
- Existing answer text unchanged: Test parameters are typical API or fragment impact on an aluminum fuel tank wall, any proposed investigative cases are allowed, no hydrocode will be provided, comparisons will be against Phase I test data, and the Government can complete the testing.
Why it matters: The new question shows the Government has not yet defined whether the program centers on external fuel spurt or internal shaped-charge jetting, so applicants should not commit to a physics focus until an answer is posted. No new requirements, budgets, or deadlines were stated.
Informational change · Description
Shallow Jet Spurt Engineering Model
- A1 answer added (Q&A section, Phase I/II questions): The Government answered the Phase II validation question. Typical test parameters are API or fragment impact on an aluminum fuel tank wall, and any proposed cases chosen for simplicity of investigation are allowed.
- No hydrocode will be provided: Phase I comparisons will be made against test data supplied in Phase I, so performers should not plan around Government hydrocode models or baseline simulation results.
- Government will complete the testing: Phase II physical testing can be completed by the Government, so applicants do not need to plan for conducting or subcontracting the experimental validation themselves.
Why it matters: Applicants can drop plans for building or licensing a commercial hydrocode reference set as a core deliverable and instead focus on proposing simplified test cases and comparison methods against the provided test data. Teaming or budget plans for independent Phase II testing can be reduced, since the Government is handling it.
Informational change · Status
Shallow Jet Spurt Engineering Model
The solicitation status moved from Pre-Release to Open. Applicants can now submit proposals, so they should begin preparing a full application package and check the posted closing date and submission instructions right away. Pre-release materials are no longer the controlling guidance; the open solicitation is. Watch for any amendments or question-and-answer postings that follow, since those can change requirements.
Informational change · Description + Requirements
Shallow Jet Spurt Engineering Model
Three new Q&A entries were added, all about Phase I and Phase II technical approach for a shaped-charge proof-of-concept effort:
- Baseline configuration: Applicants may ask whether they can choose and justify their own baseline shaped-charge design (liner material, geometry, explosive, key parameters), or whether the Government prescribes one.
- Phase I hydrocode data: Asks whether Government-provided hydrocode results, controlled simulation cases, or a runnable baseline model will be supplied as the primary reference, or whether performers should select a commercial hydrocode and generate their own reference simulations if no government data is available.
- Phase II validation: Asks whether Government-provided experimental data and test-facility access or support will be available for any new physical testing, or whether performers must conduct or subcontract testing themselves.
Why it matters: these answers determine how much modeling and test infrastructure a bidder must budget and staff. Teams without hydrocode capability or test-range access should treat the Phase I and II cost assumptions as open until the responses are posted. The entries do not show answers yet, so no eligibility, budget, or deadline changes can be confirmed from this update.
Shallow Jet Spurt Engineering Model
New opportunity: Shallow Jet Spurt Engineering Model
Similar Opportunities
Get Alerts for Opportunities Like This
RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.
Build Your Free Lane