RallyPropRallyProp.ai
DON27BZ01-NV001ActiveSBIR

Cleaner for the Time Domain Reflectometer Tank Level Indicator

Department of DefenseNAVY

AI Overview

The Navy seeks an innovative cleaning solution for fouled Time Domain Reflectometer sensors that measure fuel levels on DDG 51 destroyers. The technology must restore sensor accuracy without requiring ships to cease operations or undergo costly tank maintenance, thereby improving mission readiness and fuel management reliability.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
October 7, 2026
Due Date
November 25, 2026

Official Description

Fouling on the TDR sensor used for TLI is a persistent problem. The TDR is necessary to provide accurate and precise readings for fuel measurement. Over time, TDRs can experience sensor fouling through a buildup of crystallization and other contaminants on TDR rods and tubes, contributing to false readings or other failures if not properly maintained and cleaned.

The operational readiness of the U.S. Navy's DDG 51 Arleigh Burke-class destroyers is being undermined by a persistent and unsolved e...

View on official source

Change History

Q&A UpdatedNov 19, 2026 at 8:03 PM

Informational change · Description

Cleaner for the Time Domain Reflectometer Tank Level Indicator

  • Q&A answers filled in for previously pending items: Q1 (Phase I operability, modifications, deposit analysis, sensor offline during cleaning), Q2 (25+ fouling and tank-condition questions, many now answered, including that fouling is crystallization or biofouling, the shroud is coated but spacers are not, tanks are not heated, seawater is untreated and drawn directly from the sea), and Q3 (epoxy components, now unknown from the OEM).
  • Q4 to Q6 newly answered: Q4 refers to Phase 1 and 2 descriptions. Q5 says solvents must be MIL-DTL-16884 compatible with no change to fuel chemistry, with fuel cleaned via centrifugal purifier. Q6 states no application or removal is possible without depressurizing and dewatering the tanks, so proposals must assume availability-only work.
  • Q7 (previously pending) answered with Phase I scope, fuel (F-76), temperature and pressure references to MIL-DTL-16884, discharge-safe additives, and no fouled sample available.
  • Q8 and Q9 added: Q9 asks about shroud access, deposit analysis, and fouling location. The answer says tanks are inaccessible while full and pressurized and no fouling analysis exists.

Why it matters: Applicants should design for availability-only intervention, must keep any chemistry MIL-DTL-16884 compatible and dischargeable, and cannot rely on lab fouling data or sample hardware.

Q&A UpdatedNov 16, 2026 at 7:02 PM

Informational change · Requirements + Description

Cleaner for the Time Domain Reflectometer Tank Level Indicator

The Q&A changed in two places. The main addition is A7, which answers the Phase I questions. Its key points:

  • Phase I feasibility can be shown through small-scale testing, analysis, or modeling, so lab data is not strictly required.
  • Fuel is most commonly F-76; pressure and temperature ranges are referred to MIL-DTL-16884 and the FAQ document.
  • Proposed additives should be safe to discharge; fuel is purified by centrifugal purifier.
  • No fouled sample hardware is available, so simulated fouling is the practical route for Phase I testing.
  • Shipboard safety requirements are referenced to the FAQ and MIL-DTL-16884 rather than stated directly.

Question 7 itself was not changed beyond the existing text, and the other Q&A entries (Q1–Q6, Q8–Q11) appear unchanged. A8 still points to the external PDF.

Why it matters: applicants can now rely on analysis or modeling for Phase I, and can propose chemical treatments provided they are safe to discharge. Simulated fouling is acceptable for testing. Remaining open items are the fuel-pressure and temperature specifics, which must be pulled from the referenced military specification.

Q&A UpdatedNov 13, 2026 at 8:03 PM

Informational change · Description

Cleaner for the Time Domain Reflectometer Tank Level Indicator

  • Q&A list reshuffled and expanded: The Q&A grew from 7 entries to 11, with new questions added on the Phase I deliverable (lab-scale implementation), what counts as full sensor operability, whether modifications to the VEGAFLEX sensor are allowed, and whether the sensor can be offline during cleaning and for how long.
  • New fouling and tank-condition questions (Q2): Applicants asked whether deposits existed before the epoxy coating, whether metal corrosion was seen, where fouling occurs (above fuel, at fuel/air and fuel/water interfaces, shroud, spacers), whether shroud holes clog, and about chemical cleaning, biocides, fuel additives, seawater treatment, tank wall metal, and epoxy coverage. No answers are provided yet for these.
  • Chemistry and handling questions (Q3–Q6): New questions cover epoxy chemical composition and service life, whether centering spacers or shroud sections may be temporarily removed, whether dissolved cleaning chemistries are acceptable under Mil-DTL-16684, and whether a one-time treatment, residual coating, or removable reusable tooling is acceptable against the 8- to 36-month benefit target.
  • Earlier questions carried forward: The Phase I versus availability-application conflict, measurable operability criteria, fluid and temperature conditions, shroud dimension interpretation, fouled sample hardware, and shipboard safety rules are restated as Q7 with no answers included.
  • Answers unchanged: The reference to an external Q&A PDF, the answer that tanks are not accessible while pressurized, the Vegaflex 67/82N model answer, and the rod specifications (16.43 mm coated rod, Cu-Ni with grey epoxy, 37.55 mm shroud, 35.64 mm spacers) are the same as before. The rod-length answer and the spacer answer were truncated in this version.
Q&A UpdatedNov 9, 2026 at 9:02 PM

Informational change · Description

Cleaner for the Time Domain Reflectometer Tank Level Indicator

  • New questions added (Q1, now 7 sub-questions) on the Phase I scope conflict: The topic calls for in-place cleaning without depressurizing, defueling, or dewatering, but the prior answer says solutions must be applied during a planned availability. Offerors are asking which governs Phase I and whether a once-per-availability technology delivering an 8-to-36-month benefit is acceptable.
  • Measurable operability criteria requested: Asks how "full TDR TLI operability" should be defined (signal quality, accuracy tolerance) and whether analysis or modeling suffices or lab data is expected.
  • Tank environment questions: Fuel type, seawater presence, and temperature and pressure ranges.
  • Treatment and material limits: Whether chemical or fluid-based treatments are allowed, limits on materials, seawater discharge, and hazardous materials, and whether the existing epoxy-coated rod can be recoated or modified.
  • Shroud geometry: Whether the 37.55 mm dimension is inner or outer diameter and whether the shroud is perforated or slotted, which determines fluid access to the roughly 10 mm per-side gap.
  • Test hardware: Whether fouled sample hardware is available or simulated fouling is acceptable for Phase I.
  • Safety requirements: Shipboard requirements for materials in fuel tanks (intrinsically safe, explosive atmosphere).
  • Re-numbering only: Earlier Q&A items (access point, fouling analysis, rod configuration, sensor model) were renumbered and their answers are unchanged.
Q&A UpdatedOct 28, 2026 at 2:01 PM

Informational change · Description

Cleaner for the Time Domain Reflectometer Tank Level Indicator

The only substantive change is to Q1's answer. Previously the answer was "Response Pending" for the Q1 sub-questions; now it is filled in:

  • Access into the shroud/stilling tube: No. Tanks and rods are not accessible while full and pressurized. Any solution must be installed or applied during planned availability when tanks are depressurized and dewatered/defueled.
  • Fouling analysis: Fouling has not been closely analyzed. It is characterized only as "crystallization" and "bio growth." No cleaning interval has been determined. Cleaning ranges from cloth wipes to mechanical cleaning with brushes and pressure washers.
  • Fouling location: Fouling is observed along the full length of the rod, not concentrated at the fuel/seawater interface or the spacers.

Why it matters: Applicants should design for installation only during depressurized, defueled availabilities, and should assume fouling is distributed along the entire rod with no set cleaning cycle. Q2 and Q3 answers are unchanged.

Status ChangedOct 28, 2026 at 1:03 PM

Informational change · Status

Cleaner for the Time Domain Reflectometer Tank Level Indicator

The solicitation status moved from Pre-Release to Open. Applications can now be submitted, so business-development teams should shift from monitoring to active preparation: confirm eligibility, pull the full solicitation package, register or verify required accounts, and set internal deadlines working backward from the official close date, which should be checked directly on the posting since this update does not show a changed deadline. Questions submitted during the pre-release period may now be answered in amendments, so review any new Q&A postings before finalizing your proposal.

Q&A UpdatedOct 27, 2026 at 8:02 PM

Informational change · Description

Cleaner for the Time Domain Reflectometer Tank Level Indicator

  • New question added: A new Q1 asks whether there is an existing access point into the shroud/stilling tube (such as at the tank top flange) while the probe stays installed and the tank remains compensated.
  • New question on fouling analysis: Asks whether the fouling on the TDR rods has been analyzed (XRD, FTIR, elemental analysis) and whether its general composition can be shared (crystalline salts, fuel-derived deposits, corrosion products, or biological growth).
  • New question on fouling location: Asks where along the rod fouling is typically observed: near the fuel/seawater interface, near centering spacers or joints, or throughout the length.
  • Renumbering only: The previous Q1 (sensor model) is now Q2 with the same answer (Vegaflex 67 and 82N), and the previous Q2 (rod/cable specifications) is now Q3 with the same answers. No answers were changed.

Why it matters: Applicants should note that the new questions focus on tank access for maintenance and on fouling characteristics, which suggests the topic may involve cleaning, inspection, or fouling mitigation for the TDR probes. Expect requirements tied to in-service access and deposit chemistry, and watch for official answers to the three new questions, since none has a response yet.

Q&A UpdatedOct 19, 2026 at 7:01 PM

Informational change · Description + Requirements

Cleaner for the Time Domain Reflectometer Tank Level Indicator

  • Q1 answered: The DDG TDR TLI is identified as the Vegaflex 67 and 82N models (previously unanswered).
  • Q2 answered (sensor details):
    • Configuration: rod (not cable), Vegaflex 67 and 82N.
    • Length: varies by tank geometry; assembled from 1, 2, and 4 foot screw-together sections.
    • Diameter: coated rods measure 16.43 mm.
    • Material: Cu-Ni with grey powder-coated epoxy.
    • Stilling tube: shroud/tube inside diameter is 37.55 mm; centering spacers (every 4 feet) are 35.64 mm in diameter, leaving roughly 1.9 mm of clearance per side.

Why it matters: Applicants can now confirm the exact sensor models and physical dimensions needed to scope compatibility, mounting, and fabrication for the TLI sensor, including the rod-in-tube clearance.

Q&A UpdatedOct 16, 2026 at 2:02 PM

Informational change · Description

Cleaner for the Time Domain Reflectometer Tank Level Indicator

  • New Q&A added (Q1): An applicant asked whether the DDG TDR TLI is the Vegaflex 82 series or another model/brand. No answer is shown yet, so the brand/model identity of the required sensor is still unconfirmed.
  • New Q&A added (Q2): An applicant requested sensor specifications for the TLI: whether it uses a rod or cable configuration, rod/cable length, diameter, and material, and the gap between the rod and the inside surface of any stilling tube. No government answers are included in this version; the text only contains the questions.

Why it matters: Applicants building to a specific sensor design (rod vs. cable, dimensions, materials, stilling tube clearance) cannot price or engineer a compliant solution until the government responds. Watch for the answers to these questions, since a named brand or specific dimensions could narrow which products qualify and affect your technical approach and cost estimate.

Opportunity AddedOct 7, 2026 at 12:02 PM

Cleaner for the Time Domain Reflectometer Tank Level Indicator

New opportunity: Cleaner for the Time Domain Reflectometer Tank Level Indicator