RallyPropRallyProp.ai
DAF27BZ01-DV013ActiveSBIR

Advanced Reserve Power Source Technologies

Department of DefenseUSAF

AI Overview

The Air Force seeks advanced reserve power source technologies for weapon systems that maintain performance over 20+ years of storage without maintenance while delivering high specific energy (40-100 Wh/kg) and power density (2.5-5+ kW/kg). Solutions must rapidly activate within 600 milliseconds, operate reliably for 5+ minutes, withstand extreme environments, and address safety limitations of current battery technologies.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
October 7, 2026
Due Date
November 25, 2026

Official Description

Power source performance in terms of power and energy density is the major objective with affordability, safety, and reliability secondary objectives of Air Force Armament Directorate programs for advanced reserve power sources for weapon systems. Secondary objectives are not distant relative to the major objective, but power and energy density is emphasized in order to enable new concepts and integration strategies. Current reserve thermally activated battery technology is at risk of becoming o...

View on official source

Change History

Status ChangedOct 28, 2026 at 1:02 PM

Informational change · Status

Advanced Reserve Power Source Technologies

The solicitation status moved from Pre-Release to Open. Applicants can now submit proposals through the official channel, so preparation can shift from anticipating the announcement to active drafting against the posted requirements. Review the full announcement for the submission deadline and any eligibility criteria, and begin registration or system setup steps now, since these often take weeks to complete.

Q&A UpdatedOct 27, 2026 at 11:01 AM

Informational change · Description + Requirements

Advanced Reserve Power Source Technologies

  • Q1 answered (packaging/mass): No outer diameter or packaging envelope was specified. The Armament Directorate says a prototype of roughly 1 to 2 kg that meets the 40+ Wh/kg and 2.5 kW/kg thresholds is sufficient, so geometry is not restricted.
  • Q2 answered (non-pyrotechnic architectures): Non-pyrotechnic reserve electrochemical designs, such as hermetically isolated liquid-reserve systems with mechanical or squib activation, are confirmed as equally responsive to the solicitation versus advanced thermal batteries.
  • Q3 answered (D2P2 feasibility data): Documented non-SBIR private laboratory data on electrochemical feasibility, sub-600 ms rise time, and high-rate pulse discharge on multi-cell prototypes is confirmed to satisfy the Phase I feasibility requirement. Captive carry shock and vibration qualification remains a Phase II task.
  • Q2 (bus voltage) answered: Nominal bus voltage is 28 VDC or 270 VDC, with the allowable minimum at 75% of nominal (21 VDC or 202 VDC) and a maximum of 32 VDC or 285 VDC. Applicants should design voltage regulation to these bands under 2.5 kW/kg pulse loads.

Why it matters: Applicants can now size prototypes at about 1 to 2 kg without worrying about missile cross-section fit, pursue liquid-reserve or other non-pyrotechnic chemistries with confidence, and use existing private lab data for D2P2 Phase I. The voltage band also gives a concrete regulation target.

Q&A UpdatedOct 22, 2026 at 5:01 PM

Material change · Requirements + Scope + Description

Advanced Reserve Power Source Technologies

  • Three new Q&As added on topic DAF27BZ01-DV013 (Advanced Reserve Power Source Technologies), all unanswered so far:
    • Q on packaging: whether the Armament Directorate prefers a specific physical envelope, outer diameter (e.g., 2.75", 5.0", 7.0"), or maximum mass for the Phase II prototype, or whether modular form factors meeting 40+ Wh/kg and 2.5 kW/kg will be evaluated without geometric limits. Also asks about volumetric energy density (Wh/L) as a Phase II deliverable.
    • Q on technology scope: whether non-pyrotechnic reserve electrochemical designs (e.g., hermetically isolated liquid-reserve systems with mechanical/squib activation) are as responsive as advanced thermal battery variants, given 20+ year storage, sub-600 ms activation, and NAVSEA S9310-AQ-SAF-010 non-venting requirements.
    • Q on Phase I eligibility for Direct-to-Phase-II: whether private lab test data showing electrochemical feasibility, sub-600 ms rise time, and high-rate pulse discharge on multi-cell prototypes satisfies Phase I, with captive carry shock and vibration deferred to Phase II.
  • One more new Q on voltage: asks the TPOC to confirm target nominal output (28 VDC, 50 VDC, or higher) and the allowable voltage sag during 2.5 kW/kg pulse loads.
  • Why it matters: These questions are open, so no answers exist yet. Applicants should watch for responses on packaging limits, whether non-thermal chemistries qualify, and whether Phase I can rely on non-SBIR lab data.
  • Existing battery-size Q&A (1.5"–8" diameter, 2"–10" long) was carried over unchanged.
Q&A UpdatedOct 13, 2026 at 7:03 PM

Informational change · Description

Advanced Reserve Power Source Technologies

  • New answer added to Q1 (battery size): Q1 asked for the approximate size of the batteries, noting that a minimum size would help given the long required run-time. The previously unanswered question now has an answer: typical battery sizes range from 1.5" to 8" in diameter and 2" to 10" long.

Why it matters: Applicants can now size their power-system concepts against a concrete physical envelope. Because the answer gives a range rather than a minimum, applicants should not assume the smallest cell fits the long run-time requirement; the 1.5" to 2" end of the range may not meet it, so the design trade-off between size and endurance remains open. No eligibility, budget, timeline, security, or submission rules changed.

Q&A UpdatedOct 13, 2026 at 6:02 PM

Informational change · Description

Advanced Reserve Power Source Technologies

  • New Q&A added: Q1 asks for the approximate physical size of the batteries, with a request for the minimum size due to the relatively long required run-time.
  • No answer provided yet: The question appears without a response in this version, so applicants do not yet have guidance on battery dimensions.
  • Why it matters: Battery size directly affects hardware design, packaging, and feasibility within the run-time requirement. Applicants planning power-system designs should watch for the agency's answer, which may set constraints on enclosure or form factor and influence cost and technical approach.
Q&A UpdatedOct 9, 2026 at 8:04 PM

Informational change · Description

Advanced Reserve Power Source Technologies

The Q&A section changed from containing one question to being empty or unavailable in the updated version.

  • Removed: Q1, which asked for clarification on whether a call not explicitly titled Direct-to-Phase-II was in fact a Direct-to-Phase-II topic, since the body stated so.
  • No new questions or answers appear, and no "Response Pending" item was answered.

Why it matters: the question about whether this is a Direct-to-Phase-II topic has no published answer. Applicants should not assume the topic type is confirmed. Check the solicitation body and any official agency notice directly, and consider contacting the program contact to confirm whether the topic is Direct-to-Phase-II before planning a Phase II proposal.

Q&A UpdatedOct 9, 2026 at 3:01 PM

Informational change · Description

Advanced Reserve Power Source Technologies

  • A new Q&A was added (Q1) asking why the call title does not explicitly mention Direct-to-Phase-II, even though the solicitation body states the topic is Direct-to-Phase-II.
  • No answer is shown yet for this question, so it appears to be pending.
  • Why it matters: applicants should watch for the official response, since it will confirm whether the Direct-to-Phase-II designation applies to this solicitation. Direct-to-Phase-II generally means applicants must already have Phase I results or equivalent, so eligibility could hinge on that answer. Until a response is posted, do not assume the title discrepancy is resolved.
Opportunity AddedOct 7, 2026 at 12:02 PM

Advanced Reserve Power Source Technologies

New opportunity: Advanced Reserve Power Source Technologies

Similar Opportunities

Get Alerts for Opportunities Like This

RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.

Build Your Free Lane