RallyPropRallyProp.ai

This solicitation closed on June 24, 2026

View current Department of Defense opportunities →
DON26BZ02-DV052ArchivedSBIR

DIRECT TO PHASE II: Non-tactical Replacement of AN/UYK-43 in a Laboratory Environment

Department of DefenseNAVY

AI Overview

The Navy seeks development of a UYK-43 computer emulator using COTS hardware and open-source code to enable land-based testing of Aegis Weapon System updates, since original systems are reserved for operational fleet use and no compatible commercial alternative exists.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
May 6, 2026
Due Date
June 24, 2026 (Closed)

Official Description

The AN/UYK-43 (UYK-43) computer system is used to run certain baselines of the Aegis computer program. The UYK-43 is no longer manufactured. Operational UYK-43’s and spare parts are prioritized for operational fleet use and not testing. The Navy needs a replacement for the UYK-43 to enable land-based testing as there is no commercially available computer that is compatible with or emulates the UYK-43.

The solution must be binary compatible, provide compatible input/output capabilities, and hav...

View on official source

Change History

Opportunity RemovedJun 24, 2026 at 4:02 PM

DIRECT TO PHASE II: Non-tactical Replacement of AN/UYK-43 in a Laboratory Environment

Opportunity DON26BZ02-DV052 no longer available

Q&A UpdatedJun 5, 2026 at 9:01 PM

DIRECT TO PHASE II: Non-tactical Replacement of AN/UYK-43 in a Laboratory Environment

The government consolidated three related questions about I/O emulation, floating-point instruction accuracy, and timing requirements into reformatted Q&A entries with official answers. Key clarifications: (1) I/O subsystems must match latency/throughput precisely per BAA requirements, but detailed sensor/system characteristics not provided; (2) "binary compatible" definition remains undefined in BAA documentation; (3) UYK-43 test hardware is NOT guaranteed GFE—proposers must request and justify specific GFE needs; (4) TPOC will not provide additional guidance beyond BAA documents to maintain fair competition.

Q&A UpdatedJun 1, 2026 at 9:05 PM

DIRECT TO PHASE II: Non-tactical Replacement of AN/UYK-43 in a Laboratory Environment

Q&A Changes Summary

Added Q2 and Q3 (2 new questions). Both address critical technical gaps:

  • Q2: Requests government documentation on UYK-43's non-standard 32-bit floating-point implementation, hardware bugs/schematics, instruction-by-instruction timing specifications, and status of parallel replacement programs.

  • Q3: Reiterates need for detailed FP instruction documentation (non-IEEE-754) and confirms whether emulation timing must match legacy hardware performance.

Key clarification sought: Whether "binary compatible" requires bit-accurate FP calculations AND cycle-accurate instruction timing, and what technical documentation exists to support proposals.

Q&A UpdatedJun 1, 2026 at 8:02 PM

DIRECT TO PHASE II: Non-tactical Replacement of AN/UYK-43 in a Laboratory Environment

Summary

This Q&A addresses technical challenges in emulating legacy fire control systems, seeking clarification on whether I/O subsystem emulation is required, the specific definition of "binary compatibility," and availability of test hardware as government-furnished equipment.

Status ChangedMay 27, 2026 at 1:02 PM

DIRECT TO PHASE II: Non-tactical Replacement of AN/UYK-43 in a Laboratory Environment

Status changed from Pre-Release to Open

Opportunity AddedMay 6, 2026 at 12:52 PM

DIRECT TO PHASE II: Non-tactical Replacement of AN/UYK-43 in a Laboratory Environment

New opportunity: DIRECT TO PHASE II: Non-tactical Replacement of AN/UYK-43 in a Laboratory Environment

Similar Opportunities

Get Alerts for Opportunities Like This

RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.

Build Your Free Lane