This solicitation closed on June 24, 2026
View current Department of Defense opportunities →DIRECT TO PHASE II: Non-tactical Replacement of AN/UYK-43 in a Laboratory Environment
AI Overview
The Navy seeks development of a UYK-43 computer emulator using COTS hardware and open-source code to enable land-based testing of Aegis Weapon System updates, since original systems are reserved for operational fleet use and no compatible commercial alternative exists.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
The AN/UYK-43 (UYK-43) computer system is used to run certain baselines of the Aegis computer program. The UYK-43 is no longer manufactured. Operational UYK-43’s and spare parts are prioritized for operational fleet use and not testing. The Navy needs a replacement for the UYK-43 to enable land-based testing as there is no commercially available computer that is compatible with or emulates the UYK-43.
The solution must be binary compatible, provide compatible input/output capabilities, and hav...
Change History
DIRECT TO PHASE II: Non-tactical Replacement of AN/UYK-43 in a Laboratory Environment
Opportunity DON26BZ02-DV052 no longer available
DIRECT TO PHASE II: Non-tactical Replacement of AN/UYK-43 in a Laboratory Environment
The government consolidated three related questions about I/O emulation, floating-point instruction accuracy, and timing requirements into reformatted Q&A entries with official answers. Key clarifications: (1) I/O subsystems must match latency/throughput precisely per BAA requirements, but detailed sensor/system characteristics not provided; (2) "binary compatible" definition remains undefined in BAA documentation; (3) UYK-43 test hardware is NOT guaranteed GFE—proposers must request and justify specific GFE needs; (4) TPOC will not provide additional guidance beyond BAA documents to maintain fair competition.
DIRECT TO PHASE II: Non-tactical Replacement of AN/UYK-43 in a Laboratory Environment
Q&A Changes Summary
Added Q2 and Q3 (2 new questions). Both address critical technical gaps:
-
Q2: Requests government documentation on UYK-43's non-standard 32-bit floating-point implementation, hardware bugs/schematics, instruction-by-instruction timing specifications, and status of parallel replacement programs.
-
Q3: Reiterates need for detailed FP instruction documentation (non-IEEE-754) and confirms whether emulation timing must match legacy hardware performance.
Key clarification sought: Whether "binary compatible" requires bit-accurate FP calculations AND cycle-accurate instruction timing, and what technical documentation exists to support proposals.
DIRECT TO PHASE II: Non-tactical Replacement of AN/UYK-43 in a Laboratory Environment
Summary
This Q&A addresses technical challenges in emulating legacy fire control systems, seeking clarification on whether I/O subsystem emulation is required, the specific definition of "binary compatibility," and availability of test hardware as government-furnished equipment.
DIRECT TO PHASE II: Non-tactical Replacement of AN/UYK-43 in a Laboratory Environment
Status changed from Pre-Release to Open
DIRECT TO PHASE II: Non-tactical Replacement of AN/UYK-43 in a Laboratory Environment
New opportunity: DIRECT TO PHASE II: Non-tactical Replacement of AN/UYK-43 in a Laboratory Environment
Similar Opportunities
DIRECT TO PHASE II: Modular Software Reference Implementation for Waveforms
Due January 6, 2027
Pre-ReleaseDistributed Multispectral Event-Driven Integrated Sensing and Communications
Due January 6, 2027
Pre-ReleaseDIRECT TO PHASE II: Frequency-Based Persistent Super Intelligence Tracking and Surveillance Capability
Due January 6, 2027
Get Alerts for Opportunities Like This
RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.
Build Your Free Lane