This solicitation closed on June 3, 2026
View current Department of Defense opportunities →DIRECT TO PHASE II: Highly Loaded Grain in 2.75" Form Factor
AI Overview
This SBIR Direct to Phase II seeks to integrate Highly Loaded Grain (HLG) propellant technology into the 2.75" Mk66 rocket motor to increase range by 30% while maintaining affordability and compatibility with existing systems. The advancement addresses the need for extended-range capabilities in current unguided and precision-guided munitions platforms.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
The objective of this SBIR Direct to Phase II topic is to utilize HLG to increase the range available in a 2.75” rocket motor and advance the Technology Readiness Level (TRL) and Manufacturing Readiness Level (MRL) of HLG technology. HLG is a propellant technology that improves total impulse in a given volume, as well as provides capability for mission flexibility. The Mk66 is a low cost 2.75” rocket motor utilizing minimum smoke propellent and is in use with unguided rockets and the Advanced Pr...
Change History
DIRECT TO PHASE II: Highly Loaded Grain in 2.75" Form Factor
Opportunity DON26BZ01-DV004 no longer available
DIRECT TO PHASE II: Highly Loaded Grain in 2.75" Form Factor
Close Date changed from 2026-04-22 to 2026-06-03
DIRECT TO PHASE II: Highly Loaded Grain in 2.75" Form Factor
Open Date changed from 2026-03-25 to 2026-05-06
DIRECT TO PHASE II: Highly Loaded Grain in 2.75" Form Factor
Status changed from Removed to Pre-Release
DIRECT TO PHASE II: Highly Loaded Grain in 2.75" Form Factor
Opportunity DON26BZ01-DV004 no longer available
DIRECT TO PHASE II: Highly Loaded Grain in 2.75" Form Factor
New opportunity: DIRECT TO PHASE II: Highly Loaded Grain in 2.75" Form Factor
Similar Opportunities
A4MT - Weapons Trailer Hydraulic Heating
Due July 22, 2026
ActiveRapid Prototyping and Flight Demonstration of Medium-Range Affordable Mass Munition Air Vehicle Configurations for Collaborative Combat Aircraft and Fighter Platforms
Due October 8, 2026
ActiveLow-Cost, Extended Range (LCER) Cruise Missile Prototype Development and Testing
Due September 24, 2026
Get Alerts for Opportunities Like This
RallyProp monitors thousands of funding sources and sends instant alerts when opportunities match your technology and capabilities.
Start Free Trial