RallyPropRallyProp.ai
DAF27BZ01-DV011ActiveSBIR

Agile Wire Harness Manipulation and Installation for Unmanned Aerial Systems

Department of DefenseUSAF

AI Overview

This RFP seeks an adaptive single-arm robotic workcell to automate wire harness routing and connector installation for unmanned aerial systems and munitions production. The solution addresses a critical manufacturing bottleneck by replacing manual assembly with sensor-driven automation capable of handling flexible materials with sub-millimeter precision and rapid retaskability between product designs.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
October 7, 2026
Due Date
November 25, 2026

Official Description

Context & BackgroundModern Department of Defense (DoD) manufacturing and depot sustainment environments increasingly depend on agile automation to scale up production and maintain rapid operational readiness. While automated assembly technologies have matured substantially for rigid components with predictable geometries, the handling of flexible materials remains a persistent challenge. Specifically, wire harness routing, connector inspection, and insertion operations are ubiquitous across the ...

View on official source

Change History

Q&A UpdatedNov 13, 2026 at 7:02 PM

Material change · Requirements + Description

Agile Wire Harness Manipulation and Installation for Unmanned Aerial Systems

The Q&A was substantially updated, mainly by filling in answers that were previously pending or missing:

  • Answers added to Q1 (prime-furnished hardware): Offerors should supply their own representative hardware or work with a prime to obtain it.
  • Answers added to Q2 (demo sites, IP, ITAR, retasking, connectors, baselines): Prime introductions are TBD, with the Government to facilitate introductions to the winning proposer. SBIR and background data rights take precedence over the "full, unencumbered" language. The awardee must obtain representative hardware. Retasking scope, connector choice, and productivity baselines are left to the offeror, with baselines to be established independently.
  • Q3 (connector families, wire gauges, aperture sizes): Still unanswered; the Government deems this proprietary and directs offerors to the OEMs.
  • Q4 (productivity, retasking, traceability, factory responsibilities, software rights): Standard industrial engineering practice applies; the proposer defines retasking, traceability, and factory-interface details; the proposer handles factory demonstration arrangements; SBIR data rights apply to software.
  • Q5 (workcell scope, test articles, accuracy, quality): The proposer may make reasonable assumptions, defines the test plan and materials, and defines auxiliary equipment and quality criteria. Single robot arm is required; accuracy preference is for the assembly outcome; no inspection criteria will be provided.

Why it matters: Nearly every open question was pushed back to the proposer. Applicants must budget for sourcing their own hardware, test articles, auxiliary equipment, and factory host arrangements, and must state their own assumptions clearly in the proposal. Prime letters of support will need to be pursued independently until the Government makes introductions.

Q&A UpdatedNov 3, 2026 at 6:02 PM

Informational change · Description

Agile Wire Harness Manipulation and Installation for Unmanned Aerial Systems

  • New Q&A added (Q1): Asks whether the Government or the prime will furnish representative hardware and harness families (e.g., FAMM/Coyote) for the Phase II live demonstration, or whether offerors must supply their own structures and harnesses. No answer is posted yet, so this is an open question on who bears material and test-article costs.

  • Renumbering only: Earlier questions shifted down one number (Q1 to Q2, Q2 to Q3, etc.), with answers moved accordingly. The Q2/Q3 text and answers are otherwise unchanged; the connector-family question still says proprietary information, so contact OEMs.

  • Answers to questions 6–10 and 1–5 re-posted under new numbers: Content is identical to the prior version. Key positions for applicants: productivity methodology is "standard industrial engineering practice"; retasking scope, traceability, and quality standards are left to the proposer; no industrial host is provided; SBIR data rights apply to software; the proposer defines the test plan and acquires all materials; no quality inspection criteria will be provided.

Why it matters: The only new substantive item is the Q1 question on who supplies representative hardware, which is unanswered. Until the Government responds, budget for sourcing representative harnesses and fixtures yourself, since the existing answers consistently place that responsibility on the proposer.

Q&A UpdatedOct 29, 2026 at 2:01 PM

Material change · Requirements + Description + Scope + Contact

Agile Wire Harness Manipulation and Installation for Unmanned Aerial Systems

  • Q1 added (prime contractor and demo site): asks which primes will host Phase II demonstration and who the FAMM prime is; asks whether the Government can facilitate introductions. Notes a prime support letter may matter for a TRL 7 transition plan.
  • Q1 added (IP terms): asks how "full, unencumbered delivery of the native software" relates to SBIR data rights and restrictions on background, university, or contractor software. No answer given.
  • Q1 added (representative hardware and ITAR): asks what fuselage sections, harness CAD, or wire lists will be provided, when, and under what export-control/ITAR handling. No answer given.
  • Q1 added (retasking metric): asks who the intended operator is and whether the eight-hour window includes CAD cleanup and wire-list export. No answer given.
  • Q1 added (connectors): asks which connector families (e.g., MIL-DTL-38999, Micro-D) and aperture or clearance constraints to use for end-effector design. No answer given.
  • Q1 added (baselines): asks whether primes or the Government will supply manual cycle-time and labor-hour baselines for the ≥2× throughput and ≥50% labor-hour metrics. No answer given.
  • Q2 (connector families, previously answered): answer unchanged ("proprietary, contact the OEMs"), now renumbered.
  • Q3/A3 and Q4/A4 (productivity, retasking, traceability, factory responsibilities, software rights, workcell scope, data access, accuracy, quality): questions and answers are unchanged, only renumbered. No previously pending answers were newly filled in.

Why it matters: The new questions cover eligibility-relevant items (ITAR handling, data rights, and whether a prime partner is needed for TRL 7). Applicants should treat the unanswered ones as open risks. The only substantive Q&A changes are the six new questions, since no new answers were posted.

Status ChangedOct 28, 2026 at 1:02 PM

Informational change · Status

Agile Wire Harness Manipulation and Installation for Unmanned Aerial Systems

The solicitation's status changed from Pre-Release to Open. Applicants can now submit proposals under the posted terms, so any preparation for a pre-release posting should shift to finalizing and submitting a complete application before the deadline. Review the full solicitation text now rather than waiting on pre-release notices, and confirm the close date, eligibility rules, and required forms directly on the official posting, since those are the terms that govern submission.

Q&A UpdatedOct 26, 2026 at 8:01 PM

Informational change · Requirements + Description

Agile Wire Harness Manipulation and Installation for Unmanned Aerial Systems

  • Q1 answered: The question on representative connector families, wire gauges, aperture sizes, and bend-radius limits now has the answer "That is proprietary info. Recommend contacting the OEMs." Applicants will not get this data from the Government.

  • Q2 (items 6–10) answered:

    • Productivity baseline: standard industrial engineering practice is expected.
    • Retasking acceptance and traceability/factory interfaces: the proposer defines these.
    • Factory demonstration: the Government will not identify a host; the proposer must arrange it.
    • Software rights: SBIR data rights apply.
  • Q3 (items 1–5) answered:

    • Proposer may make reasonable assumptions on the open scope questions.
    • Proposer is responsible for the test plan and acquiring all materials, and no test articles or inspection criteria will be provided by the Government.
    • The system must work with a single robot arm, with auxiliary equipment and tooling defined by the proposer.
    • The 0.5 mm accuracy measurement method is left to the proposer, with a preference for measuring the assembly outcome.
    • Quality assessment must be defined by the proposer for general aerospace manufacturing use cases.

Why it matters: Most open scope and responsibility questions are now assigned to the proposer, so proposals must include their own test plan, host arrangement, materials, and quality criteria, with stated assumptions. Connector and fixture data must come from OEMs, not the Government.

Q&A UpdatedOct 26, 2026 at 6:02 PM

Informational change · Description

Agile Wire Harness Manipulation and Installation for Unmanned Aerial Systems

  • New Q&A added (Q1): A new question asks which connector families (e.g., MIL-DTL-38999, micro-D, D-sub) and wire gauges are most representative for the FAMM and Coyote use cases, and whether approximate aperture sizes and bend-radius limits can be shared for building feasibility test fixtures.
  • Q&A renumbered: The prior Q1 (productivity baseline, retasking, traceability, factory responsibilities, software rights) and Q2 (workcell scope, test articles, single-arm boundary, accuracy definition, quality requirements) are now Q2 and Q3 respectively, with no wording changes to those questions shown.

Why it matters: Applicants planning feasibility fixtures now have a pending question on connector and wire specifications. Watch for the Government's answer, since it will determine whether test fixtures can be built before controlled data access is granted. No existing answers were shown as changed or newly answered.

Q&A UpdatedOct 21, 2026 at 7:01 PM

Informational change · Requirements + Description

Agile Wire Harness Manipulation and Installation for Unmanned Aerial Systems

  • Q&A added (previously empty): The Q&A now contains two sets of questions, Q1 (items 6–10) and Q2 (items 1–5), with no prior version to compare against.
  • Q1 topics:
    • Productivity baseline: how cycle-time and skilled-labor gains are calculated and what equivalent-work evidence is required.
    • Retasking acceptance: definition of "two distinct harness families" and what falls within the eight-hour interval.
    • Traceability and factory interfaces: minimum records, retention, offline operation, and MES/ERP integration.
    • Factory demonstration responsibilities: who supplies the industrial host and handles approvals, safety review, and witnessing.
    • Software delivery rights: scope of "full, unencumbered" delivery, and treatment of proprietary and third-party code.
  • Q2 topics:
    • Representative workcell scope: the assembly class and process boundary for acceptance.
    • Test articles and controlled data: who supplies them and the approved channel for receiving controlled information.
    • Single-arm boundary: treatment of fixtures, positioning aids, and tool changes.
    • 0.5 mm accuracy definition: reference frame, measurement method, and what the requirement applies to.
    • Quality standards: which workmanship criteria apply and which verification steps stay with the host.
  • Why it matters: These questions are unanswered in the text provided, so no answers are yet available. Applicants should treat the open items on host responsibility, software rights, and accuracy measurement as potential cost and scope risks until the Government responds.
Opportunity AddedOct 7, 2026 at 12:02 PM

Agile Wire Harness Manipulation and Installation for Unmanned Aerial Systems

New opportunity: Agile Wire Harness Manipulation and Installation for Unmanned Aerial Systems

Similar Opportunities

Get Alerts for Opportunities Like This

RallyProp monitors 17 funding and innovation sources and sends instant alerts when opportunities match your technology and capabilities.

Build Your Free Lane