View current Department of Defense opportunities →Improved Portable Underway Replenishment (UNREP) Tester/Trainer
AI Overview
The Navy seeks a portable, self-powered Underway Replenishment (UNREP) tester/trainer system to validate ship cargo and liquid transfer equipment without requiring pier space or availability of delivery ships. This mobile solution will reduce in-port testing delays while enabling fleet training on UNREP highline operations at various locations.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
Underway Replenishment (UNREP) systems are used to transfer cargo and liquid (i.e., fuel, water) at sea between U.S. Navy ships. A tensioned line is rigged between the two ships, and the cargo/liquid is transferred along the highline between the ships. Delivery ships (i.e., T-AKE, T-AO, and T-AOE) have the equipment used to transfer the cargo and fuel, while the receiving ships (i.e., combatants, carriers, amphibious) have a simple connection point to connect the line from the delivery ship and ...
Change History
Improved Portable Underway Replenishment (UNREP) Tester/Trainer
Opportunity DON26BZ01-NV019 no longer available
Improved Portable Underway Replenishment (UNREP) Tester/Trainer
Q1 received detailed technical answer clarifying static/dynamic load test requirements from S9086-TK-STM-010 Rev 5 (50,000 lb highline, 37,500 lb sliding padeye tests, specific angles). Also clarified: tester must provide own ballast/reaction structure; AI control acceptable; trainer needs load transfer capability only, not full UNREP evolution simulation.
Improved Portable Underway Replenishment (UNREP) Tester/Trainer
**Summary of Q&A Changes:** Added 4 new detailed questions (Q1-Q4) addressing: - Specific tension/ramp/articulation parameters from S9086-TK-STM-010 Rev 5 - Pier anchor point compatibility vs. self-contained ballast/reaction structure - AI-assisted control system acceptance and safety case/IV&V requirements - Full vs. partial-task training scope and performance data qualification credit Previous answer text largely unchanged but reorganized under new Q2 label.
Improved Portable Underway Replenishment (UNREP) Tester/Trainer
Status changed from Pre-Release to Open
Improved Portable Underway Replenishment (UNREP) Tester/Trainer
**Q&A Update Summary:** A1 added: Confirms STREAM rig support only. References specific technical documents (NSTM Chapter 571 Rev 5, NTTP 4-01.4) for test requirements and procedures. Specifies deployment via standard land transportation, pier-side positioning, and crew/setup requirements (6 persons max, 8 hours max setup time).
Improved Portable Underway Replenishment (UNREP) Tester/Trainer
Q&A section updated
Improved Portable Underway Replenishment (UNREP) Tester/Trainer
Close Date changed from 2026-04-22 to 2026-06-03
Improved Portable Underway Replenishment (UNREP) Tester/Trainer
Open Date changed from 2026-03-25 to 2026-05-06
Improved Portable Underway Replenishment (UNREP) Tester/Trainer
Status changed from Removed to Pre-Release
Improved Portable Underway Replenishment (UNREP) Tester/Trainer
Opportunity DON26BZ01-NV019 no longer available
Improved Portable Underway Replenishment (UNREP) Tester/Trainer
New opportunity: Improved Portable Underway Replenishment (UNREP) Tester/Trainer
Similar Opportunities
DIRECT TO PHASE II: Solution to Reduce Towing Based Mishaps During Flightline Operations
Due September 23, 2026
ActiveDIRECT TO PHASE II: Edge-Deployed Explainable Digital-Twin Condition Based Maintenance CBM+ Platforms for Carrier-Based Systems
Due September 23, 2026
ActiveDynamically Generated, Articulated 3-Dimensional Training Content
Due September 23, 2026
Get Alerts for Opportunities Like This
RallyProp monitors thousands of funding sources and sends instant alerts when opportunities match your technology and capabilities.
Start Free Trial