TDA Isolated Phase Bus and Duct Inspection
AI Overview
The Army Corps of Engineers seeks qualified contractors to inspect the Isolated Phase Bus and Duct System at The Dalles Lock and Dam and remove approximately 100 lbs of asbestos-containing gasket material. This is a testing and abatement services requirement for a hydroelectric facility.
This summary is AI-generated from the official solicitation.
Key Details
Official Description
--- Attachment text --- [Solicitation_Amendment_W9127N27QA0020002_SF_30.pdf] 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the...
Change History
Informational change · Description
TDA Isolated Phase Bus and Duct Inspection
- The closing date is stated in the notice as moving from October 26 to October 28, 2026. However, the amendment body says October 28, 2028—an apparent inconsistency. Applicants should confirm the official deadline with the contracting officials.
- The October 13 site visit now prohibits cell phones, tablets, smartwatches, smart glasses, and other listening or photography devices; attendees should leave them in their vehicles. Photo requests may be submitted by RFI to the Contracting Officer and Contract Specialist. Only approved photos will be issued as solicitation attachments.
- The existing site-visit RSVP deadline remains October 6, 2026 at 12:00 p.m.; it had passed by the October 7 amendment date.
Informational change · Description
TDA Isolated Phase Bus and Duct Inspection
Amendment 0001 – Site Visit Details Added
New site visit requirement added (Section 3.6):
- Mandatory organized site visit: October 13, 2026, 10:00 AM–2:00 PM PDT (only site visit scheduled)
- Location: The Dalles Powerhouse Security Gate, The Dalles, OR
- RSVP deadline: October 6, 2026, 12:00 PM PDT to Nicholas.E.Weaver@usace.army.mil
- Required information in RSVP: Company name, number of attendees, attendee names, and citizenship (U.S. citizens only)
- Required safety gear: Steel-toed boots, hardhats, safety vests, safety glasses
- Required ID: Real-ID card for Powerhouse access
CMMC requirement added: Organizations must have minimum CMMC Level 2 Self-verification to access CUI Attachment F (Reference Drawings). Submit CMMC Unique Identifier Number and CAGE Code to contracting officers.
Why it matters: Prospective offerors should plan to attend the site visit and obtain required safety equipment and Real-ID documentation. Those needing access to reference drawings must verify CMMC compliance before bid submission.
TDA Isolated Phase Bus and Duct Inspection
New opportunity: TDA Isolated Phase Bus and Duct Inspection
Similar Opportunities
Get Alerts for Opportunities Like This
RallyProp monitors thousands of funding sources and sends instant alerts when opportunities match your technology and capabilities.
Start Free Trial