RallyPropRallyProp.ai
DAF26BZ06-NV036ActiveSBIR

Flightline Radio Network

Department of DefenseUSAF

AI Overview

This SBIR Phase I project seeks to develop a secure 5G Open RAN cellular network specifically designed for Edwards AFB flight line operations. The solution will modernize outdated communication infrastructure to enable real-time ground crew coordination, aircraft health monitoring, and predictive maintenance while reducing downtime.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
September 2, 2026
Due Date
October 21, 2026

Official Description

Flight line operations at Edwards Air Force Base (AFB) face increasing demands for more efficient, secure, and real-time communication systems to enhance aircraft maintenance, logistics, and operational performance. Current communication solutions are limited by outdated infrastructure, lack of interoperability, and insufficient data transmission capabilities. There is a distinct opportunity to leverage advanced cellular network technologies, particularly 5G and Open Radio Access Network (Open R...

View on official source

Change History

Q&A UpdatedOct 7, 2026 at 7:02 PM

Informational change · Description

Flightline Radio Network

  • Added two unanswered questions: whether Phase I may evaluate CBRS (3.55–3.70 GHz) and 37.0–37.6 GHz despite the stated spectrum exclusions, and whether the Government will provide flight-line site geometry or restrict use of public geospatial data. These could affect frequency options, modeling assumptions, and proposal data sources; no answers are included.
  • Existing questions and answers appear unchanged but are renumbered: the prior Q1–Q4 are now Q3–Q6, and subsequent items shift by two. No existing Q&A appears removed.
Q&A UpdatedOct 6, 2026 at 8:01 PM

Informational change · Description

Flightline Radio Network

Description information changed.

Q&A UpdatedOct 6, 2026 at 3:01 PM

Informational change · Description

Flightline Radio Network

  • Q1 answered (previously unanswered): The Government said the topic starts with a Phase I feasibility study of spectrum allocations and authorities to operate, and pointed applicants to the answers below. It did not provide the requested device list, quantities, data rates, or buffering details.
  • Phase II scope: A prototype end-to-end wireless network will be built. It will interface with current airborne-platform instrumentation systems and the existing network hardware in a localized area. Cellular metrics should match what the built system can actually do, and Phase I simulation predictions should be close to real-world performance. No numeric targets were given.
  • Q2–Q7: These appear unchanged. Q8's visible text is cut off, so any change there can't be confirmed.

Why it matters: Phase I proposals should focus on spectrum compliance and authority to operate rather than device-level network sizing. Simulations should be realistic, since they will be judged against later real-world results.

Q&A UpdatedOct 5, 2026 at 5:01 PM

Informational change · Description

Flightline Radio Network

Q&A Changes:

  • New Q1 added (Response Pending): Asks Government to provide detailed user equipment list—types of devices, quantities, data rates, and whether each buffers data locally during outages. This clarifies data persistence requirements applicants must address.

  • Original Q1 renumbered to Q2 with no answer changes: Spectrum band preferences remain the same (C-band 4400-4940MHz and 5091-5150MHz viable; FR1/FR2 investigation required).

  • Questions 2-6 renumbered to 3-7: No content changes to answers on aircraft altimeter interference, spectrum constraints, CUI/CMMC requirements, zero data-loss requirement, or Phase I operational outcomes.

  • Original Q7 renumbered to Q8: Multi-part question on prototype scope, Open RAN, performance targets, Edwards integration, spectrum, aircraft compatibility, and Phase II support remains with incomplete answer (text cut off).

Impact: New Q1 signals Government wants applicants to propose detailed device inventories and data-buffering architectures—critical for Phase I planning and cost estimation.

Q&A UpdatedSep 30, 2026 at 6:01 PM

Informational change · Description

Flightline Radio Network

Description information changed.

Q&A UpdatedSep 30, 2026 at 3:02 PM

Informational change · Description

Flightline Radio Network

Description information changed.

Q&A UpdatedSep 24, 2026 at 3:01 PM

Informational change · Description

Flightline Radio Network

Description information changed.

Status ChangedSep 23, 2026 at 1:04 PM

Informational change · Status

Flightline Radio Network

Status changed from status: Pre-Release to status: Open.

Q&A UpdatedSep 10, 2026 at 8:01 PM

Flightline Radio Network

All 7 questions received answers clarifying: Phase I focuses on feasibility and spectrum compliance using simulations, performance metrics, and commercial hardware within NTIA bands. Government will define success measures and require integration with Edwards' existing network equipment and cybersecurity protocols. Edwards AFB will provide Phase II testing facilities, access, and spectrum approvals.

Q&A UpdatedSep 9, 2026 at 9:19 PM

Flightline Radio Network

This Q&A clarifies that Phase I performers have flexibility to use representative lab environments and commercially available components rather than Air Force-specific hardware, and allows them to define performance targets—though Phase II will require actual Edwards AFB integration support that the Government will coordinate.

Opportunity AddedSep 2, 2026 at 12:02 PM

Flightline Radio Network

New opportunity: Flightline Radio Network

Similar Opportunities

Get Alerts for Opportunities Like This

RallyProp monitors thousands of funding sources and sends instant alerts when opportunities match your technology and capabilities.

Start Free Trial