RallyPropRallyProp.ai
FA860126R0019ActiveCONTRACT

SABER FY 27-32

Department of DefenseFA8601 AFLCMC PZIO

AI Overview

SABER is a DoD facilities construction and renovation contract requiring specialized experience in SCIFs, historic preservation, and research labs. The opportunity targets 8(a) small businesses in SBA Region V to deliver design-build construction services with government cost estimating tools.

This summary is AI-generated from the official solicitation.

Key Details

Agency
Department of Defense
Funding Amount
—
Release Date
September 15, 2026
Due Date
October 16, 2026

Official Description

--- Attachment text --- [FA860126R0019_RFI_Responses_08_October_2026.pdf] RFP Paragraph Reference/Section Title Question Response Solicitation Page 1, Block 10, Note 5 The Solicitation noted that a company would need to have an office established before the proposal due date. In Dec of 2025, the SBA changed the rules that a BFO didn't need to be established until 60 days after contract award. Has that changed?
Solicitation Amended. SBA Region V (including Illinois, Indiana, Michigan, M...

View on official source

Change History

Description ChangedOct 8, 2026 at 5:38 PM

Material change · Requirements + Eligibility + Attachment + Description

SABER FY 27-32

  • Office location requirement loosened: The prior Note 5 required 8(a) firms to have their principal office or SBA-approved Bona Fide Office in the six-state Midwest area before proposal submission. The updated Q&A says the solicitation was amended so the office must be in place within 60 days of contract award, per SBA Policy Notice 6000-874794. This is the most consequential change for eligibility.
  • Brand-name justification posted: The Gordian e4Clicks/RS Means J&A for the required estimating software was added to the solicitation, which removes pre-award protest uncertainty about that requirement.
  • Software licensing specified: Offerors must price 15 networked e4Clicks Project Estimator Professional licenses plus 15 licenses each of the Master Composite, Facilities, and Assemblies data packages, resolving the earlier ambiguity over which datasets were required.
  • Self-performance clarified: The 8% self-perform minimum is a floor; AF 3064/3065 forms must identify self-performed tasks, and additional self-performed work is above that floor.
  • Pricing coefficients flexible by period: Coefficients A–D may differ by ordering period, but the proposed values are fixed for the rest of the contract.
  • Experience gate unchanged: Federal design-build experience cannot substitute; offerors need two of three specialty categories (SCIFs, historic preservation, research laboratories).
  • Site visit materials: As-built drawings are available by zip file on request, photography of existing conditions is allowed, and no follow-up site visit will occur; discrepancies must be submitted as written questions.
  • Seed project technical clarifications: Existing devices in Room 136 must be reinstalled, and the wall must meet STC 50, with the method left to the contractor's design.
Description ChangedSep 23, 2026 at 7:53 PM

Informational change · Description

SABER FY 27-32

Description information changed.

Opportunity AddedSep 21, 2026 at 11:23 PM

SABER FY 27-32

New opportunity: SABER FY 27-32

Similar Opportunities

Get Alerts for Opportunities Like This

RallyProp monitors thousands of funding sources and sends instant alerts when opportunities match your technology and capabilities.

Start Free Trial